BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in San Francisco, California. Completed plans call for the renovation of a water / sewer project.

This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times. A brief description of the Scope of works. Trade Contractor is to remove and dispose/recycle all installed temporary internal shoring bracing, including struts, walers, ledgers, pin piles and other steelwork (incl. Staircase frames) in Building 600. The bracing system was furnished and installed by the T31.01 Trade Contractor, Malcolm Drilling Co. Inc. The Engineer of Record for this shoring scope of work is Brierley Associates, appointed by Malcolm Drilling to perform all engineering and monitoring of the overall shoring system. This scope of work does not include shoring removal at adjacent facilities. Included in this scope of work is waterproofing protection and responsibility for rebar safety protection. Applicants who pre-qualify as Bidders are hereby notified that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB), and the Water Infrastructure Finance and Innovation Act (WIFIA), also administered by the US EPA. Applicants who pre-qualify as Bidders are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (DBEs) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are project-wide participation goals that the Contractor may seek to meet: 1. 5.6% MBE 2. 1.2% WBE The project wide goal for Local Business Enterprise participation for the Project is 12% of the Contract Sum. The Local Hiring Goal for the Construction Phase of the Project is 30% and 50% for apprentices for each trade. In accordance with California Labor Code Sections 1771.1 and 1725.5, no contract can be awarded to a Bidder without proof that the Bidder and all identified subcontractors are currently registered with the California Department of Industrial Relations.

Under Construction

Water / Sewer

$1,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
50
Bidding Soon
1,761
All Active Projects
746
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2022

September 1, 2022

img_map_placeholder

To Be Determined, San Francisco, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.