BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in McGregor, Minnesota. Completed plans call for site work for a water / sewer project.

The Mille Lacs Band of Ojibwe, Community Development office will be accepting sealed lump sum bids for replacement of an on-site septic system for the home located at 36564 208th Place, McGregor. General Notes: It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the MN Chapter 7080. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. Contractor must reconnect all utilities, service panel or service feed. Contractor will secure all permits and fees. Contractor is responsible for a thorough investigation of the scope of work. Contractor will repair any damage to the property or structure created by the scope of work. Contractor shall be responsible for all debris removal related to all work performed under this work scope. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES. Work Scope Description: Please note that bids will only be accepted from licensed septic installers performing 34% or more of the work scope themselves. Bids will not be accepted from general contractors or contractors with restricted licenses. Contractor shall provide all equipment, materials and labor to complete the work described or referenced in this rfp, MN Chapter 7080, provided IHS Specifications, including EZ Excavating, LLC design. Install an on-site septic system per the provided IHS Specifications, including septic design by EZ Excavating, LLC. Contractor shall ensure a complete and functional system. The contractor shall have the existing septic tank pumped and crushed or filled per design. Contractor shall complete tank abandonment form and submit a copy to the Project Coordinator with pumping receipt. Contractor shall be responsible for contacting the Mille Lacs Band's contracted inspector to coordinate inspections. Contractor shall also be responsible contacting Project Coordinator, Carla Dunkley, to schedule project site visits to see scratch, tanks and rock bed before covering. Contractor shall provide an As-Built System drawing for submission to MLBO and contracted inspector. Contractor will not receive final payment until the Band's contracted inspector conducts a successful final inspection and issues a Certificate of Compliance; and Owner has been supplied with full lien waivers for all subcontractors and suppliers. Contractor is responsible for removal and disposal of existing mound materials per design and disposing of them off-site. Contractor shall be responsible for pumping tanks for the duration of project, including the period of drying once the old mound materials are removed. Contractor is responsible for cutting vegetation and tree removal as required to install the system in accordance to MN Chapter 7080. Contractor is responsible to cutting trees located within the mound foot print and immediately around the mound, as needed to access the area to construct said mound. Trees shall be cut flush with the ground. Any trees measuring 6" or more in diameter shall be cut into 8' sections and hauled to the DNR shed located at 37846 Hwy 65, McGregor. Contractor shall follow proper MN Chapter 7080 mound prep procedure, keeping traffic off the designated mound area. Contractor shall be responsible for the cost of any: compaction testing; re-design fees; or additional costs associated with system redesign or relocation; if these expenses are incurred due to contractor or subcontractor damaging the mound location. Contractor shall provide and install SJE Rhombus panel with event counter per design. Contractor shall be responsible for electrical connections and any required trenching. Contractor will be responsible for all yard repairs caused by system installation, including grading, black dirt cover and seeding. Contractor is responsible for calling Gopher One before digging. Due to the weather dependent nature of the work, work is shall be completed as soon as possible but the contract will be drafted with a completion date of July 31, 2023. Specified Product Substitutions: No substitutions will not be allowed on products specified within the design. Contacts: Interested bidders shall contact Carla Dunkley, Project Management Compliance Officer at 320-630-2495 or by E-mail at carla.dunkley@millelacsband.com for a copy of the IHS Specifications, including Environmental Systems design; and to be included on the bidder's list in the event that any addendums are issued for this project. Community development/project management reserves the right to reject any and all bids for any reason.

Post-Bid

Water / Sewer

$30,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
21
Bidding Soon
377
All Active Projects
120
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 27, 2022

August 26, 2022

July 31, 2023

img_map_placeholder

36564 208th Pl, McGregor, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.