BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2022 at 8:00 PM

Updated August 5, 2025

Site work and paving for a mixed-use development in Spencer, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposed work is along Pleasant Street from Wire Village Road to High Street and Smithville Road from Pioneer Valley Road to Pleasant Street. The scope of roadway work includes, but is not limited to, full depth reclamation, full depth construction, pavement milling and overlay, minor box widening, closed drainage system improvements, hydrants and other related work, excavation and removal of unsuitable road material, furnishing and installing hot mix asphalt paving, removing and resetting existing granite curb, furnishing and installing new AAB/ADA compliant hot mix asphalt sidewalks and cement concrete wheelchair ramps, hot mix asphalt and granite curb, adjustment of existing drainage and utility structures to final grade, furnishing and installing compost filter tubes and silt sacks, new signs and pavement markings, providing traffic management, and other incidental work. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price.

Award

Roads / Highways

$1,914,650.00

Public - City

Paving, Site Work

122

7

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
659
Active Projects
229
Bidding Soon
4,867
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2022

October 3, 2022

Project location map

Pleasant St & Smithville Rd, Spencer, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.