BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving, new construction and renovation of a civil project in Bastrop, Texas. Completed plans call for the construction of a road / highway; for the renovation of a road / highway; for site work for a road / highway; for paving for a road / highway; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

Simsboro Aquifer Water Supply Facilities - Package 2 - 0.5 MG Clearwell The City of Bastrop is in the process of converting its water supply source from shallow alluvial wells primarily fed by the Colorado River to deep wells that draw from the Simsboro Aquifer; which will provide the City with a reliable, resilient, drinking water supply. This package is for the construction of the 0.5 MG Clearwell. The project consists of the following: A new well field and production facilities Three additional wells will be needed to meet Phase 1 flows, which consist of an average production capacity of 3 MGD and a peak capacity of 6 MGD. Groundwater treatment facilities Based on water quality sampling, a WTP primarily focusing on iron and manganese removal will be needed. It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building. Once treated, water will flow to a 0.5 MG clearwell Ground Storage Tank (clearwell) 5 MG clearwell, Transmission pump station Transmission pumps will pull water from the clearwell and send it through the 24-inch diameter, 21,500 lf transmission pipeline to GSTs at the Willow Site. Transmission piping - Lift Station and Force Main A 21,500 lf wastewater forcemain will run along the same route as the transmission pipeline to convey wastewater generated during filter backwash and in the Filter Building to the City's wastewater collection system. Associated services Electrical and instrumentation Site development and access Various site improvements, paving, grading, fencing, landscaping.

Award

Water / Sewer

$1,700,000.00

Public - City

New Construction, Paving, Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
44
Bidding Soon
2,327
All Active Projects
891
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.