Site work and paving for a civil project in Eureka, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Donmyer and Water Well Road Improvements Work shall consist of removing the existing structures, constructing reinforced concrete drainage boxes, grading, aggregate surfacing, traffic control, and seeding at the locations shown on the construction plans. Any questions regarding the specifications or the bidding process are to be addressed to Saline County Administrative Resource Center at (785) 309-5810. The County reserves the right to reject any and all bids and to waive technicalities. Saline County shall make the decision as to what constitutes a technicality. No bid may be withdrawn after opening time for a period of 90 days. Late bids will be rejected. The Contractor will commence the work required by the Contract Documents no earlier than October 1, 2022 (Early Start Date). This is the date utility relocations are expected to be completed. Upon approval by Saline County, the Contractor may begin construction earlier if utility relocations are completed sooner. The project must be completed by September 29, 2023 (Completion Date). Once construction has started, the Contractor has 120 working days with 0 clean up days, beginning with the first day traffic control is in place, to complete each project. In the event the Contractor fails to complete this work on or before the dates herein established, Saline County shall be entitled to liquidated damages of $400.00 for each day the work goes uncompleted. A bid bond, cashier's check or a certified check in an amount of not less than five Percent (5%) of the total amount of the bid shall accompany each proposal made payable without conditions to "Saline County." The amount of the said proposal guarantee may be retained by and forfeited to Saline County as Liquidated Damages if the proposal covered thereby is accepted and a contract based thereon is awarded and the bidder should fail to enter into a contract in the form prescribed, with legally responsible sureties, within ten (10) days after such award is made by Saline County. Performance bond: A contract bond to Saline County, in an amount equal to 100 percent (100%) of the Contract price. Statutory Payment Bond: A payment bond to Saline County in an amount equal to 100 percent (100%) of the Contract price. The Contractor shall file the Statutory Payment Bond at the office of the Clerk of the District Court. liquidated damages of $400.00 for each day the work goes uncompleted
Award
Roads / Highways
$894,579.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2022
October 1, 2022
E Water Well Rd & S Donmyer Rd, Eureka, KS
Related To This Project
Eureka, KS
Bid Date: Aug 22 2022
Eureka, KS
Bid Date: Sep 21 2022
Eureka, KS
Bid Date: Apr 18 2019
Eureka, KS
Bid Date: Mar 09 2023
Eureka, KS
Bid Date: Aug 15 2023
Eureka, KS
Bid Date: Feb 23 2021
Eureka, KS
Bid Date: Feb 09 2022
Eureka, KS
Bid Date: Nov 20 2024
Eureka, KS
Bid Date: Jul 06 2022
Eureka, KS
Bid Date: Oct 19 2022
Leavenworth, KS
Bid Date: Aug 03 2022
El Dorado, KS
Bid Date: Jun 15 2022
Topeka, KS
Bid Date: Jun 15 2022
Gridley, KS
Bid Date: Jun 15 2022
Leonardville, KS
Bid Date: Jun 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.