BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Glendale, Arizona. Completed plans call for the renovation of a medical facility.

As of October 6, 2022, project was awarded to Caliente Construction Inc, awarded amount is $3,933,708.28. The scope of this project is a general remodel of the interior and exterior of an existing building to be used as a public facing light-duty medical clinic. The scope also includes mechanical, plumbing, electrical, and low voltage systems. There is limited scope relating to site work. This solicitation does not include scope at the stand-alone WIC building at 5141 W. Lamar Road. Q & A deadline: Aug 02, 2022 3:00:00 PM MDT During the design phase of the Public Health Glendale Remodel, the building was broken into, resulting in vandalism and various damage, including, but not limited to: Drywall, Electrical, Plumbing, Glass, Flooring, Rooftop HHVAC, and possible Minor Fire and/ or Smoke Damage. Prospective bidders are to be aware of this situation, investigate accordingly, and request information, as needed, during the solicitation period. Damage may be observed and/or further investigated during any non-mandatory site visits. Permitting Authorities and Authorities Having Jurisdiction: There are two permitting authorities for the Public Health Glendale Remodel project: Maricopa County Planning and Development, and the Glendale Fire Marshall. Planning and Development as authority over all permitted scope, except the fire alarm and fire sprinkler scopes. The Glendale Fire Marshall only has authority relating to fire alarm, fire sprinkler, fire protection water service from the street, and related life safety issues Required Fire Protection Line (New): A new fire service line is required by the Glendale Fire Marshall and may or may not be noted in the design drawings. This service must be installed at the street water main and brought to the building. Design, submittals, permitting, and installation shall be handled by the contractor. Design will be handled as a deferred submittal to the Glendale Fire Marshall and, once approved by Glendale, it is anticipated that a confirming deferred submittal will be made to Planning and Development. Contract duration: 270 days Contract renewal: Not Applicable Prices good for: 180 days

Award

Medical

$3,933,708.00

Public - County

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
12
Bidding Soon
707
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

September 8, 2022

img_map_placeholder

5139 W Lamar Rd, Glendale, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.