BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Three Rivers, Michigan. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of August 23 2022, the project has not yet been awarded. A timeline for award has not yet been established.** Construction of a new headworks facility at the City's Wastewater Treatment Plant. Project is funded through the State of Michigan Clean Water State Revolving Fund (CWSRF) In general, the work consists of replacement of the existing pretreatment (headworks) facility. Proposed improvements include the construction of a new headworks facility including, but not limited to a mechanically cleaned bar screen, washer compacter, tray-style grit removal system, grit pumps and grit classifier, ionization MAU, concrete channels, stop plates, electrical equipment, instrumentation, and appurtenances in an insulated block building. Additional improvements include a dumpster/reserve septage uploading pad, abandonment of the existing pretreatment building, and various sitework and restoration items. The issuing office is Jones & Henry Engineers, Ltd., 4791 Campus Drive; Kalamazoo, Michigan 49008, Phone (269) 353-9650. Copies of the Bidding Documents may be examined at the Owner's office listed above or the issuing office, without charge. Technical questions regarding the project should be e-mailed to the Project Manager, Aaron J Davenport, PE, adavenport@jheng.com at Jones & Henry Engineers, Ltd. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by a Bid Bond in the amount of 5% of the amount bid with satisfactory corporate surety, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid, and Labor and Material Bond in the amount of 50% of the Bid. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 30 days after the actual opening thereof. The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner.

Bid Results

Water / Sewer

$5,179,000.00

Public - City

New Construction, Site Work

58

20

28

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
31
Bidding Soon
791
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

October 3, 2022

img_map_placeholder

409 Wolf Rd, Three Rivers, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.