BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of an educational facility in San Jose, California. Completed plans call for the renovation of a educational facility.

Modernization of the 7 existing hydraulic elevators in 4 buildings on the San Jose City College Campus: (2) Elevators in the Technology Center; (1) In General Education Building; (2) In Cesar Chavez Library; (2) In Student Parking Structure. Work involves replacement of various operating components in the elevator shaft and cabs; replacement of hydraulic pumps in machine rooms and elevator controllers. Related work includes; Refinishing the elevator cabs, hoistway doors, and electrical systems supporting the elevator system. Modifications to the existing fire alarm system will be required to accommodate the new installation. Patch and repair, to complete indicated scope. San Jose Evergreen Community College District strives to make our events accessible to everyone. Please email Cindy Giesing, if you require sign language interpretation, closed captioning, or other accommodations for the Zoom Job Walk. The District will provide insurance coverage through SEWUP, an Owner Controlled Insurance Program, or OCIP. Details will be included with the bid documents. This project requires Prevailing Wages and is covered by the District's Construction Careers Agreement with the Santa Clara and San Benito Building & Construction Trades Council. Online Q&A Yes Q&A Deadline 07/28/2022 5:00 PM (PDT) The District reserves the right to reject any and all Bid Proposals or to waive any irregularities or informalities in any Bid Proposal or in the bidding procedure. Summary of Work. The Project entails, under the following required licenses B, C-10, C-11, C-16, modernization of the 7 existing hydraulic elevators in 4 buildings on the San Jose City College Campus: (2) Elevators in the Technology Center; (1) In General Education Building; (2) In Cesar Chavez Library; (2) In Student Parking Structure. Work involves replacement of various operating components in the elevator shaft and cabs; replacement of hydraulic pumps in machine rooms and elevator controllers. Related work includes; Refinishing the elevator cabs, hoistway doors, and electrical systems supporting the elevator system. Modifications to the existing fire alarm system will be required to accommodate the new installation. Patch and repair, to complete indicated scope. Contractor must coordinate its work with a scheduled power shut-down, as well as ongoing day-to-day operations of an active school site

Award

Educational

$3,143,067.00

Public - City

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
110
Bidding Soon
2,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.