BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a playground / park / athletic field in Elyria, Ohio. Working plans call for site work for a playground / park / athletic field.

This project includes the design, layout and construction of new playground equipment at North Park in the City of Elyria. DESCRIPTION OF WORK: The Contractor shall furnish all labor, equipment, supplies, and supervision of labors necessary to complete the work. This project includes the design, layout and construction of new playground equipment at North Park in the City of Elyria, Ohio Questions will be received in writing to Kathryn McKillips, P.E. at kmckillips@cityofelyria.org SCOPE OF WORK A. OBJECTIVES Generally, the scope of work will include, but is not limited to, the following: Design, supply and install play equipment at North Park in one (1) location. This is a replacement installation for ages 5-12. Playground Equipment Requirements A. Minimum of 10 play elements. Preference will be given to designs that include the 3 elements in Exhibit A. B. Contractor shall provide design plan for the area. All design plans/drawings shall be in color. C. Contractor shall supply with proposal a complete description of the length and type of parts the warranty covers on all pieces of equipment D. Initial inspection of equipment shall be made within the week of installation. E. Replacement Parts Books and Instillation Instructions shall be supplied for all proposed playground components. F. The playground system will be a multi-colored system. Specific color combinations to be determined. G. The playground area should be designed for children ages 5-12 H. 2 Bay swing I. 5" poles to be used Existing playground area may be expanded, if needed, to include all elements K. Contractor to include mulch L. ADA accessible element Contractors shall meet manufacturer's specifications and industry standards for installation. Systems shall meet National Playground standards as referenced in the American Society for Testing and Materials (ASTM) document F1487-95; Standard Consumer Safety Performance Specification for Playground Equipment for Public Safety. Evidence of compliance shall be submitted and stamped on equipment as required

Pre-Construction/Negotiated

Playgrounds / Parks / Athletic Fields

$112,500.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
101
Bidding Soon
1,171
All Active Projects
471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 25, 2022

img_map_placeholder

To Be Determined, Elyria, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.