BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Sandstone, Minnesota. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

Mille Lacs Band of Ojibwe, DNR/E is requesting proposals from qualified vendors/contractors to perform the following services: Proposal must include plan to complete road construction according to the Natural Resource Conservation Service Minnesota construction and specification provided at the site visit. Work will include installation of 32 LN. FT 12 diameter culvert covered to 30 yards of class 5 gravel. Contractor will cut, fill and shape half a mile of designated route. Contractor will follow all Designated NRCS soil erosion methods. Contractor must comply with all state and local laws, ordinances, codes, and/or regulations applicable for the installation. Contractor is responsible for obtaining all permits needed for this project. All work must be completed by September 30th 2022. Tribal Employment Rights Ordinance (TERO) applies for this proposal (see Bidding note 2 below). Firms must be licensed with the Mille Lacs Band of Ojibwe. A copy of this license (or the license application) must accompany each bid. Licensing process can take several weeks. If you are not currently licensed with the MLBO, please submit a copy of your license application along with your proposal. Contact Elizabeth Thornbloom at (320) 532-8274 or via email with questions regarding licensing and for the license application. BID GUARANTEE PERIOD: I agree to hold this bid open for a period of 90 days after the bid opening. If this bid is accepted I agree to execute a Contract and/or a Purchase Order with the Mille Lacs Band of Ojibwe along with furnishing all required bonding (if required) and insurances. TERO COMPLIANCE: I understand that this company, its subcontractors and all employees performing work on this project will be expected to comply with all Mille Lacs Band TERO Compliance Regulations. Upon being informed that I will be awarded a contract for this project, I will submit all required TERO Compliance Plans directly to the MLB TERO Office for review and approval. MLBDNR/E/Project Management Reserves the Right to Reject Any and All Bids for Any Reason.

Post-Bid

Roads / Highways

$300,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
49
Bidding Soon
671
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2022

August 26, 2022

Project location map

To Be Determined, Sandstone, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.