BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Oxford, Iowa. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge replacement on Half Moon Avenue SW over Deer Creek. A 30'-0" long by 3O'-6" wide single span continuous concrete slab bridge shall replace the existing 26' long by 20' wide steel stringer bridge with a concrete deck and abutments. Section 5, T79N, R7W, Johnson County, Iowa. A Certified check, made payable to the County, or a Cashier's check, made payable to either the County or to the Contractor, drawn upon a solvent bank or a bid bond, shall be filed with each proposal. Cashier's check, made payable to the Contractor, shall contain an unqualified endorsement to the County signed by the Contractor or his/her authorized agent. Failure to execute a contract and file an acceptable bond and certificate of insurance within 21 days of the date of the approval for awarding of the contract, as herein provided, will be just and sufficient cause for the denial of the award and the forfeiture of the proposal guarantee.

Award

Bridges / Tunnels

$600,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
47
Bidding Soon
437
All Active Projects
221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 26, 2022

img_map_placeholder

Half Moon Ave SW, Oxford, IA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.