EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Clifton, New Jersey. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

** Note: bidders must obtain their bid specs directly from the City of Clifton to be considered a valid bidder. ** Bids are to be delivered no later than the prevailing time indicated above, but it is strongly urged that due to Covid-19 restrictions, bids be delivered ahead of the above bid opening time. Bids shall be delivered to the Finance Office, located on the 2nd Floor of 900 Clifton Ave, Clifton, County of Passaic, New Jersey 07013, attention of James J. Jorgensen, Purchasing Agent. The City of Clifton is prohibited from publicly opening bids on Mondays or any day directly following a State or Federal holiday, according to N.J.S.A. 40A:11-4(a) and 40A:11-23 a and b. General Description of the 2021 NJDOT Sidewalk and Curb Improvements: 2021 NJDOT Sidewalk and Curb Improvements includes the construction of handicapped curb ramps, the replacement of concrete curbs, sidewalks, driveway aprons, final restoration, cleanup and tree planting. Required bidder information can be found in the specification documents. Bidders shall comply with the requirements of the Equal Employment Opportunity/Affirmative Action as specified in N.J.S.A. 10:5-31 and N.J.A.C. 17:27 et seq.

Bid Results

Sidewalks / Parking Lot

$1,557,469.00

Public - City

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
299
Bidding Soon
5,261
All Active Projects
2,213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

August 29, 2022

img_map_placeholder

Multiple Locations, Clifton, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 NJDOT Sidewalk and Curb Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.