BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a fire / police facility in Estes Park, Colorado. Conceptual plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

The proposed work will consist of: Space needs assessment of existing facilities to evaluate current working conditions and project the needs for future growth, in line with the 2022 Draft Strategic Plan. Station 71 - Dannels Fire Station Station 72 - RMNP Station Conceptual design of Station 73 consistent with the 2022 Draft Strategic Plan objectives as identified in programming activities. Conduct a design charrette with staff and/or board members Investigate the feasibility of renovation of the south section of Station 71 as one option for improvement and/or change of use. Evaluate the possibilities for expansion of our Station 72 in conjunction with the implementation of the 2022 Draft Strategic Plan. Rough order of magnitude cost estimates for each of the options described above including cost per square foot estimates for each type of construction recommended. Investigate site opportunities in the Estes Valley to establish an estimated cost for land acquisition necessary to accommodate the conceptual design of Station 73. Estimate the costs for the design work necessary to complete the development of construction documents for bidding and construction purposes. Estimate design, development, and construction timelines for the conceptual design that is developed. Present the work product to staff and board members at a to-be-determined meeting. RFP Questions Due July 18, 2022 5:00pm RFP Questions Answered July 22, 2022 5:00pm Notice of Award August 5, 2022 Notice to Proceed* August 8, 2022 Commencement of Work August 9, 2022 Design Charrette TBD Presentation to Staff/Board TBD Options: Oct. 12, 16, Nov. 9 Project Deadline November 1, 2022 All deliverables The method of contractor selection has not been determined at this time

Conceptual

Fire / Police

$80,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
38
Bidding Soon
955
All Active Projects
402
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

img_map_placeholder

Multiple Locations, Estes Park, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.