BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Chinle, Arizona. Completed plans call for the renovation of a playground / park / athletic field.

This is a request for quotations for construction prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Part 13 and Part 36, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation issued as Request for Quotation (RFQ) 140P1522Q0078. FAR clauses and provisions enclosed within this RFQ are those in effect through Federal Acquisition Circular (FAC) 2022-06 and are available in full text through Internet access at http:// www.acquisition.gov/far/. All questions should be emailed directly to the Contracting Specialist. Only written RFI's will be considered and responded to by the Government. NPS responses to RFIs will be posted as an amendment to the solicitation Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Apache Type of Construction: Building Magnitude: Between $25,000 and $100,000 NAICS: 238290 SIZE STD: 16.5 SET-ASIDE: Small business set-aside National Park Service Contracting Specialist Contracting Officer (CO) Name: Taylor Jones Email: Taylor_A_Jones@nps.gov An organized site visit has been scheduled for July 28th , 2022 at 10:am Arizona Time. Participants will meet at: Canyon De Chelly National Park, 3 mi E. of Chinle on N7, Chinle AZ 86503 Award Selection Process: Award will be made in accordance with FAR Part 13 to the offeror that provides the best value to the government based on price, technical, and prior experience. This solicitation is not stating nor required to state the relative importance assigned to each evaluation factor and/or sub factor (FAR 13.106-1(a)(2)). 1. Price. 2. Technical: Technical is the factual documentation of the firm's ability to meet the specifications. 3. Prior experiences: Prior experience is the factual documentation or narrative of a firm's experience, qualifications, and capability, along with providing examples of their firm's most recent projects within the past five years of similar size and scope. GENERAL (a) The National Park Service (NPS) is seeking quotations for construction services as attached in the accompanying statement of work. The NPS intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13. (b) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quotation. Respondents are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to quotation requirements, at the time of submission, may result in the quotation being unacceptable to the Government and eliminated from consideration for award. (c) Respondents are cautioned to submit adequate information to enable the Government to fully ascertain each respondent's capability to perform the requirements in accordance with the requirements of the request for quotation (RFQ). (d) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the Contracting Officer in writing (email is the preferred method) with supporting rationale prior to the closing of this RFQ. (e) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government. (f) Quotation must be valid for a minimum of 60 days. (g) All interested parties shall be registered in the System for Award Management or SAM at time an offer or quotation is submitted. (h) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate. (i) Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer and Contracting Specialist. (j) All questions should be emailed directly to the Contracting Specialist. Only written RFI's will be considered and responded to by the Government. NPS responses to RFIs will be posted as an amendment to the solicitation. PERIOD OF PERFORMANCE (Reference 52.211-10) Notice to Proceed will only be issued upon receipt of acceptable bonding and insurance. All onsite work is estimated to be performed: 8/15/2022 thru 12/15/2022 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
1
Bidding Soon
78
All Active Projects
22
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 5, 2022

August 15, 2022

img_map_placeholder

To Be Determined, Chinle, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.