Published March 30, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a military facility in Dayton, Ohio. Completed plans call for the renovation of a military facility.

Contract Award Date: Mar 29, 2023 Contract Award Number: 47PF0023C0019 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LLW3NFVJSET8 Contractor Awarded Name: Dawn Incorporated Contractor Awarded Address: Warren, OH 44483 USA Base and All Options Value (Total Contract Value): $1,591,352.87 The General Services Administration (GSA), Region 05, is seeking a qualified contractor for the Emergency Generator and Fire Pump Replacement at the Walter H. Rice Federal Building and U.S. Courthouse located at 200 West 2nd Street in Dayton, Ohio. The scope of work includes replacement of the existing diesel generator and existing fire pump with a new 500 kW natural gas generator and a new fire pump. The construction cost estimate is between $1,000,000 and $3,375,000. The performance period is 275 calendar days upon receipt of the on-site Notice to Proceed. The North American Industry Classification System (NAICS) Code for the proposed acquisition is 236220 with a small business size standard of $39.5 million. A pre-proposal conference is scheduled for August 29, 2022 at 9:00 AM Central/10:00 AM Eastern. It will be held in Conference Room 150. AMENDMENT 01 Issued on 09/07/2022 to provide responses to RFI's and Bid Addendum #1. Files added: Amendment 01 Updates Description for Bid Adddendum 1 Bid Addendum 1 - Revised Specs 2022 08 29 Pre-Poposal Sign-In Sheet AMENDMENT 02 Issued on 09/14/2022 to provide responses to RFI's and extend the due date/time to 4:00 PM CDT on September 23, 2022. AMENDMENT 03 Issued on 09/21/2022 to address all RFI's to date, revise the SF1442 & incorporate a pricing breakdown form, issue a bid addendum #2 with drawing updates, incorporate Section 012000 - Allowances, and extend the due date/time to 4:00 PM CDT on September 30, 2022. AMENDMENT 04 Issued on 09/29/2022 to extend the due date/time to 4:00 PM CDT on October 5, 2022 and revise language in the Agreement and the Solicitation. NOTE: The Contracting Officer for this project will be Joel Doucette, joel.doucette@gsa.gov. Please send proposals to his attention. Also, a future amendment will be issued to address RFI's. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$1,591,352.00

Public - Federal

Renovation

30

25

44

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Closeout Procedures, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Roof Windows and Skylights, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
70
Bidding Soon
1,351
All Active Projects
559
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Emergency Generator and Fire Pump Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.