BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fontana, California. Contact the soliciting agency for additional information.

The City of Fontana ("City") is accepting proposals from qualified Geotechnical firms to serve as the Owner's Geotechnical Engineer of Record ("GEOR") to prepare geotechnical and soils investigation, as well as perform site and laboratory materials sampling and testing ("Work"), for a proposed design-build parking structure. The proposed project is called the Downtown Parking Structure Project ("Project") and is being designed pursuant to California Public Contract Code section 22160 et seq. All work associated with this project shall conform to the City's standard plans, Greenbook specifications including any amendments made by the City, and any other building codes or regulations applicable to this project. The proposed Project is to be constructed within the existing parking lot of the City's Human Resources Department Building located at 8491 Sierra Avenue, Fontana, CA 92335 (Reference Exhibit "A" Vicinity Map), and shall consist of a 4-tier parking structure. Each tier will have a footprint of approximately 130 feet by 230 feet with one vehicle entrance and exit at a location not yet determined. The City anticipates 330 - 350 parking spaces and one elevator. The intent of the structure is to serve as both public and employee parking for the civic campus as well as the planned downtown area which is to be revitalized. The Work will be awarded in two phases. Phase I will include all effort required to prepare the geotechnical and soils investigation, and phase II will include geotechnical engineer of record ('GEOR'), site and laboratory testing of soil, placement of asphaltic paving materials, onsite construction observation, inspection and testing services during rough and fine grading activities, observation of reinforcing steel placement, observation of concrete placement where required by the design and/or CBC, concrete mix design review, observation of concrete masonry placement including grout and mortar sampling where required by the design or CBC, observation of Post-tension ('PT') tendon placement, observation of PT tendon stressing, PT tendon testing, observation of embedments, observation of bolt installation, bolt testing required by design and/or CBC, observation of field welding and nondestructive testing of welding, and a summary report. Online Q&A Yes Q&A Deadline 08/04/2022 2:00 AM (PDT) Type of Award Lump Sum The method of contractor selection has not been determined at this time.

Conceptual

Parking Garage

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
103
Bidding Soon
2,221
All Active Projects
875
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

img_map_placeholder

8491 Sierra Ave, Fontana, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.