EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Los Angeles, California. Completed plans call for site work for a water / sewer project.

Project No: E222-143 Contractor shall harvest and reuse 100% of the storm water from the Facilities Building Roof, into the Cogen cooling towers, to satisfy the 85th percentile, 1-day rain event and to meet the State of Californias Industrial General permit (IGP) requirements. Contractor shall provide all new piping, storage tanks, pumps and other required infrastructure as specified in the Contract Documents. Contractor shall develop and submit Shop Drawings of the Stormwater Capture and Reuse system for deferred approval and permit by the Campus Building Official. To be allowed to submit a bid, Bidders must have the minimum experience set forth in the Prequalification Questionnaire contained in the Bidding Documents and posted on the UCLA Online Planroom website. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. A mandatory Pre-Bid Conference will be conducted on April 12, 2023 beginning promptly at 10:00 a.m Mandatory Pre-Bid Conference via ZOOM: The mandatory Pre-Bid Conference will be conducted via ZOOM and shall begin promptly at 10:00 a.m. Participants must log onto the ZOOM meeting at or before 10:00 a.m. (See ZOOM meeting instruction below.) Persons logging in later than said time will not be allowed to bid on the Project as prime contractors. Join Zoom Meeting: https://ucla.zoom.us/j/92421533784 Meeting ID: 924 2153 3784 One tap mobile +12133388477, 98670287466# US (Los Angeles) +16692192599, 98670287466# US (San Jose) Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami) Find your local number: https://ucla.zoom.us/u/adJIVaI7XH

Award

Water / Sewer

$1,097,650.00

Public - State/Provincial

Site Work

22

23

36

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Special Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Aids, Temporary Hoists, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Contracts, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Architectural Wood Casework, Plastic-Laminate-Clad Architectural Cabinets
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
156
Bidding Soon
2,437
All Active Projects
975
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cogen Stormwater Capture and Reuse

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.