BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated September 17, 2025

Renovation of a water / sewer project in Quebec, Quebec. Completed plans call for the renovation of a water / sewer project.

INRS platform development and scaling up of a wide variety of bioprocesses, including among other things bioreactors from 5L to 2000L. In recent years, the operation of the laboratory has highlighted the need of the various partners for larger capacity bioreactors allowing the implementation of an intermediate scale between the 2 m 3 reactor and the industrial level fermentations of 200 to 600 m 3. The project provides for the addition to the current platform of a 20 m 3 bioreactor and a 10 m 3 bioreactor , both cleanable and sterilizable in place, and equipped with complete instrumentation. Substantial related equipment is also planned (mixing and storage tank, interception/neutralization/sterilization tank before discharge into the sewer ( killer tank ) in order to be able to handle, store and dispose of the substrates produced in the bioreactors 10 and 20 m 3 . Downstream processing equipment is also planned for the project: a centrifugal decanter type centrifuge, a disk centrifuge, as well as a spray dryer. INRS therefore wishes to develop a laboratory space inside the LISTE building located at 2605, boulevard du Parc Technologique in Quebec City, in order to accommodate this new infrastructure. This space is partially occupied and must be arranged according to the needs of the future laboratory. An office space and a laboratory space adjacent to the project are already occupied by the researchers and must remain functional throughout the work. The rest of the spaces will remain occupied by the researchers during the work. The area to be developed is approximately 325 m 2 . The work includes the development of a space and the necessary services for the installation of the spray dryer and the associated equipment (supply tank, dust collector, etc.). The work also includes the purchase and installation of the centrifugal decanter and the high pressure homogenizer. The mechanical and electrical fittings (heating/ventilation/air conditioning/control) to serve the spaces where the equipment will be installed are also planned in the first phase. TIMELINE: Construction was completed in 2024.

Occupancy

Water / Sewer

$2,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
52
Bidding Soon
885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

Project location map

2605 Bd du Parc Technologique, Quebec, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.