Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a municipal facility in York, Maine. Completed plans call for the addition of a 14,060-square-foot municipal facility; for the demolition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.
The Town of York, Maine is soliciting your qualifications for Construction Manager at Risk services related to the renovation and expansion construction of a new Town Hall. The Construction Manager (CM) will provide pre-construction services to the Town prior to commencement of construction. At the completion of the Construction Documents the CM will bid the documents to qualified subcontractors. The CM will prepare a Guaranteed Maximum Price (GMP) and, upon its acceptance, will build the Project. The CM will be expected to work closely with the Town and Architect and to propose cost and timesaving alternatives. The town is inviting CM's to participate in the following selection process: The Project consists of the site development, renovation of the historic building, and the construction of a new two-story addition with basement. The existing 212- year-old town hall is wood frame/timber frame. It has a footprint of 2,900 square feet and a total 5760 square feet. The addition will have a footprint of 3,000 square feet and a total of 8,300 square feet. While it is known that the existing building will have a full interior renovation, the extent of the renovation is currently being evaluated and will require input from the chosen Construction Manager. The project is on town-owned land, part of a shared Town Green with the First Parish Church, located at 186 York Street. York Town Hall is in the York Historic District and a National Historic District. Approximately three prospective CMs will be selected by Aug 4, 2022 for interviews on Wednesday, Aug 10, 2022. The schedule for the project is for the CM to work in conjunction with the design team to develop the construction documents by the end of 2022 and to bid to subcontractors at the beginning of 2023. Construction on the first phase to occur in Spring 2023. To minimize interruption of Town services to the citizens of York, the project will be conducted in two phases. The first phase is to construct a new addition while the existing Town Hall conducts normal business. When the new addition is complete, move the Town Clerk and Finance Department into the new addition to continue Town business. The second phase involves vacating the existing Town Hall and renovating the building. The Architect for the Project, Port City Architecture of Portland, has completed a conceptual design that will be used as the basis for the initial cost estimate. (see Attachments) The town reserves the right to waive any informality in proposals, to accept any proposal, and, to reject any and all proposals, in whole or in part, should it be deemed for the best interest of the town to do so.
Award
Municipal
$5,190,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2022
September 26, 2022
186 York St, York, ME
Related To This Project
York, ME
--
York, ME
Bid Date: Aug 16 2023
York, ME
--
York, ME
--
York, ME
Bid Date: Jul 08 2022
York, ME
Bid Date: May 25 2022
York, ME
Bid Date: Jun 14 2022
York, ME
--
York, ME
Bid Date: May 03 2022
York, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.