BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Arlington, Texas. Completed plans call for the renovation of a transportation facility.

The City of Arlington is seeking proposals from qualified firms to provide a turnkey replacement of four (4) existing roof top units at the Arlington Municipal Airport Terminal. The Airport Terminal is an active Terminal that operates 24hrs. 7 Days a week and will remain active during the project. Each firm responding to this Request for Proposals (RFP) shall provide the following in the RFP. 1. Review existing conditions of the Aaon Roof Top equipment. 2. Review existing roof curb size and supports and include needed modifications to support the replacement roof top equipment including supports and walkway if required for safe access to the unit for required maintenance. 3. Review original MEP drawings that established Trane equipment as the basis of design with the shop drawings provided for Aaon equipment on the original building submittals to determine if other HVAC system components need to be adjusted or replaced to support the new roof top equipment. 4. Existing operating controls is Schneider and will need to be incorporated, installed, adjusted or replaced to support the new Carrier rooftop units 5. Carrier units to be factory pre-wired with the installation of a 120V convenience outlet at each roof top unit. 6. Include costs in the RFP for providing detailed shop drawings that show the removal of existing equipment and the re-wiring; replacement parts, new replacement equipment and operating controls to complete the project. The Owner will want to review the shop drawings during the review phase. 7. The replacement roof top units are to be Carrier. The proposer may submit an alternate. 8. Provide a Gantt chart to show the proposed duration of the project, including providing Owner with an estimated delivery date of the new Carrier units. 9. Include a 10% contingency the proposed cost for the complete project HVAC Replacement for Arlington Airport The City of Arlington reserves the right to reject any or all bids and waive any and all informalities. Question Cut Off October 20, 2022 03:00:00 PM (ET)

Post-Bid

Transportation Terminals

$540,000.00

Public - City

Renovation

3

9

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
65
Bidding Soon
3,545
All Active Projects
1,403
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.