BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Camino, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Construction of bicycle and pedestrian improvements to Pony Express Trail from Sanders Drive to Sly Park Road. Specific improvements include approximately 1,100 linear feet of new sidewalk and 3,150 linear feet of widening existing sidewalk, 1.7 miles of Class II bike lanes, ADA ramps, 8 new solar powered flashing beacons, drainage improvements, and improved delineation. Performance, construction or installation of other items or details not mentioned above, that are in the Plans, Standard Plans, Standard Specifications, or these Special Provisions. The award of Contract, if it will be awarded, will be to the lowest responsive Bidder whose Proposal complies with all the requirements prescribed. Owner reserves the right to award; BASE BID or ADDITIVE ALTERNATIVE BID A with the BASE BID or reject all bids. The Contract will be awarded based upon the total bid for both the Base Bid and Additive Alternative Bid A. The Contract time is ONE HUNDRED (100) WORKING DAYS. For bonding purposes, the anticipated Project cost is less than $2,000,000.00

Award

Roads / Highways

$2,945,688.00

Public - County

Paving, Site Work

91

19

30

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
10
Bidding Soon
981
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2023

October 21, 2023

Project location map

Pony Express Trail, Camino, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.