BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction, remodeling, renovation and addition to a mixed-use development in Orlando, Florida. Working plans call for the addition of a stadium; for the demolition of a stadium; for the construction of a stadium; for the remodel of a stadium; for the renovation of a stadium; for site work for a stadium; and for paving for a stadium.

Shortlisted confirmed The University of Central Florida Board of Trustees, announces that services in the disciplines of construction management will be required for the project The project will consist of providing pre-construction and construction services for the Football Campus Projects. The six proposed UCFAA Football Campus Projects include: 1. Stadium South Tower (Bldg. #135 - addition/remodel/renovation) 2. Football Practice Field Relocation 3. McNamara Cove (Bldg. #363 - new building) 4. Parking and Plaza Expansion 5. Wayne Densch Sports Center Renovation (Bldg. #077 - addition/remodel/renovation) 6. Stadium North Seating Expansion (Bldg. #135 addition) A preliminary cost estimate has been developed for the projects and can be found in the building program listed above, however the overall project budget and individual project budgets may vary from this estimate based on final designs, scope, and sequencing. The project may be phased and the budget may be changed at UCF's discretion. This project is subject to the availability of funding The contract for construction management services will consist of two phases. Phase one is preconstruction services, the value of which will be negotiated with the selected firm. Phase one services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at 100% Construction Documents. If the GMP is accepted, phase two, the construction phase, will be implemented. In phase two of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager's contract.

Final Planning

Arenas / Stadiums

$200,000.00

Public - State/Provincial

Addition, Demolition, New Construction, Paving, Remodeling, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
62
Bidding Soon
1,292
All Active Projects
547
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2022

November 29, 2022

img_map_placeholder

Multiple Locations, Orlando, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.