BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in DFW Airport, Texas. Completed plans call for the renovation of a transportation facility.

The Federal Aviation Administration utilizes the Acquisition Management System (AMS) in place of the Federal Acquisition Regulations (FAR). This is a Request for Proposal for the D10 Terminal Plumbing Replacement requirement located in Dallas, TX. The contractor shall provide all labor, materials, and equipment necessary for the D10 Terminal Plumbing Replacement requirement. The FAA anticipates an award of a Firm-Fixed-Price contract type for this requirement. The project size for this requirement is estimated to be between $1,000,000 and $5,000,000. This contract is anticipated to be a Competitive Set-Aside to Total Small Business per 3.6.1.3.2 if the Contracting Officer determines the contractor is responsible and the offered price is fair, reasonable and in the best interest of the FAA. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM SIZE STANDARDS (NAICS) FOR THIS REQUIREMENT IS 238220 - Plumbing, Heating and Air-Conditioning Contractors and the size standard for the NAICS code is $16.5M. IN ORDER TO DO BUSINESS WITH THE FEDERAL GOVERNMENT YOU MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM). SEE AMS CLAUSE 3.3.1-33 "SYSTEM FOR AWARD MANAGEMENT" (JULY 2018). Milestone Dates: A site visit is scheduled for TBD. If you wish to attend, submit your name, company, and contact information for all attendees to BOTH Joni Haynes at joni.l.haynes@faa.gov and Sam Culberth at sam.g.culberth@faa.gov no later than TBD. All questions regarding the SIR should be submitted in writing via email to BOTH Joni Haynes (joni.l.haynes@faa.gov) and Sam Culberth(sam.g.culberth@faa.gov) no later than July 19, 2022 at 1600 ET. See page 1, block 13 of this solicitation for the proposal due date, any proposal received after the proposal due date will be deemed non-responsive and will not be considered for award. Delivery: 390 Days After Notice to Proceed Delivery Location Code: 2697456F 2697456F 697456 DOT FAA TCB D10 DFW AIR TRAFIC CONTROL TOWER 2401 N INTERNATIONAL PARKWAY DFW AIRPORT TX 752610000 US 00001 D10 Terminal Plumbing Replacement. The contractor 1 JB shall furnish all equipment, labor and services to replace the plumbing in accordance with the attached specifications document. Electronic & IT: 03 All contractors proposing this project desiring an interpretation or clarification of the specifications, drawings, contract terms and conditions, etc., must make the request by e-mail to Sam.G.Culberth@faa.gov and Joni.L.Haynes@faa.gov. Telephone questions will not be accepted. The requestor must provide a company name, point-of -contact name, as well as a return e-mail address. The Contracting Officer is the only person authorized to make clarifications, interpretations, or changes to this solicitation. QUESTIONS ARE DUE by July 19, 2022 by 1600 EST. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work includes (but not limited to): Architectural 1. Completely remodel TRACON, Base Building, and ESU Building restrooms. a. Remove and replace existing drywall, paint, and tile. b. Remove and replace existing water closets, urinals, and partitions. c. Remove and replace existing sinks, faucets, countertops and mirrors. d. Remove and replace all associated architectural items related to the restrooms. Electrical 2. Provide and install disconnects, breakers in panels and circuits as shown on the drawings for all new Computer Room Units. 3. Provide and install new lights in all the restrooms in the Base Building, TRACON, and ESU Building. 4. Provide Lock Out Tag Out (LOTO) procedures for all new equipment. 5. Provide Arc Flash Risk Assessment (AFRA) labels for all new disconnects for equipment. Mechanical 6. Remove existing 21 - 7.5 Ton Liebert Computer Room Units (CRUs) in the TRACON "NAV/COMM" & "RADAR/ARTS" rooms and replace with 15 new - 10 Ton Liebert (or approved equal) computer room units in a phased manner approved by the Project Engineer. 7. Provide new chilled water piping from the main 6" lines to each Computer Room Unit. Remove old branch piping and valve and cap at the tee. a. Includes supply and return chilled water piping, piping insulation, all branch piping valves, control valves, temperature and pressure gauges, test ports, and all related materials for the CRUs. 8. Provide new control panels, devices actuators, flow meters, and control wiring for all of the new computer room units. Sequence of operations for the CRUs shall replicate the existing sequence.

Post-Bid

Transportation Terminals

$5,000,000.00

Public - Federal

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
207
Bidding Soon
4,917
All Active Projects
1,880
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 7, 2022

November 8, 2022

December 4, 2023

img_map_placeholder

2401 International Pkwy, DFW Airport, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.