BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a civil project in Palo Alto, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

***As of September 13, 2022. Project not awarded yet. Description of Project: Removal of existing potable water piping and valving in existing vaults and installation of new 10" to 16" piping and pressure reducing valves. Piping work includes saw cutting, excavation, backfill, concrete work, grouting, and paving. Work also removal and replacement of electrical wires, electrical boxes, hazardous lead paint removal, welding work, and traffic control and coordination with City Staff. NTP Date expected 11/29/2022 Project Duration 66 working days after NTP Bid Valid 90 days Liquidated Damages $3,800 Online Q&A Yes Q&A Deadline 07/28/2022 1:00 PM (PDT)

Bid Results

Water / Sewer

$999,100.00

Public - City

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
142
Bidding Soon
2,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

April 13, 2023

Project location map

Multiple Locations, Palo Alto, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.