Published October 21, 2022 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in East Palo Alto, California. Completed plans call for the renovation of a water / sewer project; and for site work for a road / highway.

Bid Valid 90 Days Liquidated Damages $5,618/Day Start/Delivery Date October 17, 2022 Project Duration Must be completed by December 31, 2023 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 08/04/2022 1:00 PM (PDT) The 12kV Electrical Power Distribution Loop Rehabilitation Project includes seven phases of work that are being planned and sequenced in the upcoming years to coordinate with other ongoing capital improvement projects at the Palo Alto Regional Water Quality Control Plant. This Bid Package 1 (IFB 185744) includes Phase 1 work which pertains to the replacement of Switchgear 1914X, Load Center No.3, Load Center No.4, and their associated conductors; installation of temporary conductors and conduits during shutdown and switchover; demolition of exisiting equipment (load centers, switchgear, transformer, etc.); site preparation work such as vegetation, pavement and curb removal; site civil, structural and other miscellaneous work as specified in the project plans and specifications. THIS IS A PREVAILING WAGES PROJECT.

Award

Water / Sewer

$6,070,000.00

Public - City

Renovation, Site Work

56

18

33

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Design Data, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Commissioning of Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Electrical Utility Transmission and Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
107
Bidding Soon
1,686
All Active Projects
780
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2022

October 17, 2022

img_map_placeholder

2501 Embarcadero Way, East Palo Alto, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

12kV Electrical Power Distribution Loop Rehabilitation Bid Package 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.