BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a golf course in Davenport, Iowa. Completed plans call for site work for a golf course.

This renovation is to address those bunkers that have been washed out time and time again by heavy rains and thunderstorms. Due to the washouts, the sand in those bunkers gets mixed with soil and silt and inevitably creates a hard pan layer in the bunker that will not allow water to drain properly. By removing all of the material inside the bunkers and starting from scratch, we can make sure the finished product will last many years to come, playing the same as it did on day one. The contractor must remove all original material to get back to the base soil/clay layer. The golf course will provide a staging area for this old material to be hauled to. A dump truck may be provided by the City of Davenport to haul this material upon request of the contractor. New 4" perforated drainage pipe is to be installed to allow water to drain efficiently. New outlets may be installed if needed, or new pipe can be connected to current outlets if possible. Approximate lengths of drainage pipe per bunker will be provided by the Golf Supervisor. Davenport Golf is looking for a qualified contractor to complete a bunker renovation at Emeis Golf Course. This renovation will address the bunkers that are in the worst shape with a list of those bunkers with approximate square footage to be provided by the Golf Supervisor. We are planning to redo what bunkers we currently have by removing the old sand, installing new drainage, installing a state of the art liner, and re-sodding the edges; no new construction will be required at this time. 7/20/2022 03:00:00 PM (CT) Questions Due Questions are due to the Purchasing Division no later than the time indicated. Submit your questions via email to purchasing@ci.davenport.ia.us and include the title of the project with your contact information. 7/22/2022 03:00:00 PM (CT) Answers Posted Answers to inquiries that were emailed to the Purchasing Division will be issued in the form of an addendum no later than the date indicated. The addendum will be issued via an email. Plan Holders

Post-Bid

Golf Course

$50,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
37
Bidding Soon
551
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2022

September 2, 2022

img_map_placeholder

4500 W Central Park Ave, Davenport, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.