BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and renovation of a laboratory facility in Byron, Georgia. Completed plans call for the renovation of a laboratory facility; and for the demolition of a laboratory facility.

Award Details Contract Award Date: Sep 15, 2022 Contract Award Number: 12405B22C0024 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: C3BKD1R9DKQ3 Contractor Awarded Name: MSAB LLC Contractor Awarded Address: Perry, GA 31069-9246 USA Base and All Options Value (Total Contract Value): $426045.84 The USDA, Agricultural Research Service (ARS) Southeast Area (SEA) Southeastern Fruit and Tree Nut Research Laboratory, located in Byron, GA., has a requirement (subject to the availability of funds) to Renovate Lab Space in Lab 125,126,130 and 229. The work includes but is not limited to: The contractor shall furnish all supervision, labor, materials, and equipment and perform all work necessary to remove existing casework, counter tops, electrical and plumbing fixtures and properly dispose of. The contractor shall install new casework, electrical, gas and plumbing fixtures. The contractor shall furnish all labor and materials for the described project in strict conformity with safety, standards, laws, statutes, and ordinances for a chemical/biological research laboratory biosafety level 2 (BSL2) in a federal facility. The work consists of and is not limited to providing all supervision, labor, materials, supplies, equipment, quality assurance and other related services and materials as required to: Removal of fume hoods in labs 125, 130 & 229. Fume Hoods are a Presumed Asbestos Containing Material (PACM). Removal must be done by a certified asbestos abatement tech and without disassembling. Once Fume Hood is removed, must be wrapped in two layers of 6 mil plastics and then disposed of as asbestos containing material (ACM). Demolition and removal of all casework. The contractor is responsible for locating and completely shutting off gas, water and electrical during this phase. All that can be recycled shall be recycled and weight recorded. Some demolition and removal of ceiling tiles and ceiling grid around fume hoods in labs 125, 130 and 229. The contractor shall provide and install all new lower cabinets, upper cabinets, sink cabinet, knee space assemblies, countertops, sinks, fixtures, electrical outlets and any fillers or scribes necessary for complete installation. This shall include final connections of any mechanical, gas, plumbing and electrical. All counter tops shall be 1" black phenolic resin worktop and Greengard certified - similar or exceed specifications of FunderMax RE-Technology (see attached brochure). A 6" high applied backsplash of same material as countertop. Will include sinks, outlets, pegboard, 30"w. x 30"h. w/46 Pegs & Drip Trough, cup sinks and some fabrication The contractor shall re-install undamaged ceiling grid and tiles or install new ceiling grid and tiles where applicable in rooms 125, 130 and 229. Water saver service fixtures and fittings to include H & CW faucets, H/C mixing faucet, DI faucet, pre- rinse hose unit, and deck mounted AGV service valves and required mounting hardware. All valves will be mounted in original locations unless specified otherwise. Wall mounted single channel electrical raceway, wiring, outlets and cover plates. Must be installed in accordance with the most recent National Electrical Code (NEC). If an equivalent metal wire mold is going to be used, its use must first be pre-approved.. Cove Base moldings shall be removed from walls and new installed on walls and base cabinets. Moldings shall be black Please refer to Section L.7 (b) of the attached Clauses and Provisions for site visit information. SIZE OF PROJECT: In accordance with FAR 36-204, the estimated price range is between $100,00 and $250,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Laboratories

$426,045.00

Public - Federal

Demolition, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
44
Bidding Soon
592
All Active Projects
276
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2022

September 27, 2022

img_map_placeholder

21 Dunbar Rd, Byron, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.