Published July 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Burlington, Massachusetts. Completed plans call for site work for a water / sewer project.

Cleaning and Dredging of sediment and materials in the stream. The work under this contract will include all equipment, labor, material, supplies, etc. necessary to furnish the work described in this contract. The work consists of cleaning and dredging sediment and materials within a stream as herein described, by use of vactor technology on Sandy Brook, between an existing outlet on Raymond Road (paper road) to an existing inlet on Bedford Street, approximately 637' feet long, in Burlington, Massachusetts. The second area of work to be done is behind the property of one (1) Fairfax Street, at the outlet of an existing ten (10") inch reinforced concrete pipe. The drainage channel needs to be reestablished at or lower than the outlet elevation. This drainage gully is approximately four feet (4') wide and approximately forty feet (40') long and empties into the main stream at station 2+25. Two tree logs approximately 4' long and 20" wide must be removed from this channel by come along or chainsaw if needed. The material dredged from the stream, whether by Vactor or hand, shall be disposed of legally as stated in the Order of Conditions and must be accompanied by Massachusetts Department of Environmental Protection (Mass DEP) Material Shipping Record (MSR). All testing and disposal requirements shall be in accordance with Mass DEP Interim Policy #COMM-94-007. The vactor truck shall operate from the existing roadway only. The stream shall be dewatered to an extent which allows for the most efficient and effective dredging that minimizes decanting of dredged material. At a minimum, the Contractor shall use two (2) stream bypass pumps sized appropriately for the flow conditions present during the Project. The stream shall be dammed just upstream from the dredging by use of sandbags or other similar materials. One bypass pump shall be installed on the upstream side of the dam and discharge downstream of the dredging area. The second pump shall be installed within the dredging area and discharge downstream of the dredging area. A bypass pumping detail is included in the Appendix. All work shall be completed within ninety (90) calendar days from the date of the Notice to Proceed.

Post-Bid

Water / Sewer

$140,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
778
Active Projects
340
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2022

August 26, 2022

Project location map

Multiple Locations, Burlington, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed