BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Pine Bluff, Arkansas. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

The Purpose of This Project Is to Replace Bridge and to Widen, Including Curb, Gutter, and Sidewalks, Highway 190 in Jefferson County. This Project Consists of Clearing and Grubbing, Removal and Disposal Items, Earthwork, Aggregate Base Course, Portland Cement Concrete Base, Achm Base, Binder, and Surface Courses, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Approach Slabs, Maintenance of Traffic, Minor Drainage Structures, Erosion Control, Construct One Integral Prestressed Concrete Girder Structure (Total Length 96.50'), Pavement Marking, and Misc Items. Federal Aid Project STPLC-9345(41) Routes: 190 Sections: 5 County: Jefferson Length: 0.383 mile in length. This Proposal Contains the Special Provision "establishing Contract Time - Working Day Contract" in Which the Bidder Will Determine the Number of Working Days to Complete the Project. Questions Pertaining to Projects During the Advertisement Period Should Be Addressed to the Program Management Division at Pmd@ardot.gov. the Deadline to Submit a Question Is the Wednesday Prior to the Scheduled Letting Date. a Question Submitted After the Close of Business on the Wednesday Prior to the Scheduled Letting Date May Not Receive a Response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Stand The purpose of this project is to place ultrathin bonded wearing course on approximately 17.290 miles of highway 63 in Lawrence and Randolph counties. This project consists of removal and disposal items, aggregate base course, fog seal, ACHM surface course, ultrathin bonded wearing course, cold milling asphalt pavement, ACHM patching of existing roadway, approach gutters, maintenance of traffic, guardrail, rumble stripes, pavement marking, and misc. Items. ARDS Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financial assistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - 11th Ave - Harding Ave. (Hwy. 190) (Pine Bluff) (S)

Award

Bridges / Tunnels

$5,344,054.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
20
Bidding Soon
250
All Active Projects
118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2022

October 10, 2022

img_map_placeholder

AR-190, Pine Bluff, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.