Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 7, 2022 at 8:00 PM
Updated January 26, 2024
Demolition, site work, paving and new construction of a civil project in Oneonta, Alabama. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.
As of September 7, 2022, no bids were received. No definite date for the rebid. The Utilities Board of the City of Oneonta, Alabama D. All qualified bidders are invited to submit a Bid under sealed envelope to The Utilities Board of the City of Oneonta, Alabama, for the furnishing and installation of approximately one crossing installation of 115' of 12" Steel Casing, 181' of 6" MDPE, Stops, Hot Taps, testing, and connections to existing system, and all necessary appurtenances Located on SR 74 Near Moore Road near Susan Moore, Alabama. Bids not received by the indicated time will not be opened. Addenda and other bidding information will be issued only to holders of drawings and specifications distributed by the Engineer.
Final Planning
Bridges / Tunnels
$530,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2022
March 7, 2023
To Be Determined, Oneonta, AL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
