Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 29, 2026 at 7:00 PM
Updated January 30, 2026
Site work and new construction of a mixed-use development in Portsmouth, New Hampshire. Conceptual plans call for the construction of a 60,000-square-foot fire / police facility; for site work for a fire / police facility; and sidewalk / parking lot.
The results of the space needs study conducted in FY14 determined the current Police facility no longer meets the needs of the Department. This project would fund the design and construction of a new facility after a site selection study and conceptual design are complete. As of August 29, 2026, this project is still in the conceptual phase. It is included in the city's 2026-2032 Capital Improvement Plan. Further information regarding a design firm and timeline for construction has not yet been established. *The closed solicitation has been included below for reference: The City of Portsmouth seeks design alternatives to meet the program needs of the Portsmouth Police Department, which is presently housed in a 45,000 square foot portion of the Portsmouth City Municipal Complex. The current structure does not meet present program needs and requires significant improvements. The Portsmouth City Council is responsible for selecting the site of the new Community Policing Facility, and for funding construction. 07/7/22 End of question period for RFQ The current PD facility is located on several floors of the City Hall complex. The project consists of the planning and design of a new approximately 60,000 SF facility new Police Facility comprised of a PD Headquarters of approximately 49,500 SF, a Firing Range, and a PD Fleet Maintenance component of approximately 16,600 SF, and parking for PD staff, PD vehicles, and visitors. An RFQ pre-submittal conference will not be held. The City welcomes any questions regarding this solicitation. Questions should be addressed to Joseph Almeida, Facilities Manager, at jalmeida@cityofportsmouth.com A response in the form of an addendum will be made to all written questions received by July 7, 2022 at 4:30 p.m. The addendum will be posted on the City website by July 14, 2022 at 4:30 p.m. The method of contractor selection has not been determined at this time.
Conceptual
Fire / Police
$42,200,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
3 Junkins Ave, Portsmouth, NH
Related To This Project
Portsmouth, NH
--
Portsmouth, NH
Bid Date: Jan 19 2023
Portsmouth, NH
--
Portsmouth, NH
--
Portsmouth, NH
--
Portsmouth, NH
Bid Date: Aug 13 2020
Portsmouth, NH
Bid Date: Aug 18 2020
Portsmouth, NH
--
Portsmouth, NH
--
Portsmouth, NH
Bid Date: Sep 19 2022
Portsmouth, NH
--
Portsmouth, NH
Bid Date: Sep 21 2022
Portsmouth, NH
Bid Date: Apr 09 2021
Portsmouth, NH
--
Portsmouth, NH
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
