BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Newport Beach, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; and water / sewer project.

Bid Valid Liquidated Damages $1,000 Per Day Estimated Bid Value $160,000.00 Start/Delivery Date Project Duration 40 Consecutive Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A No The work necessary for the completion of this contract consists of removing and replacing existing wooden planters, wooden arches, light fixtures, electrical conduit, irrigation lines, irrigation valves and controller, and irrigation drain pipe system and planting new flowers on the Goldenrod Pedestrian Bridge. Department of Industrial Relations (DIR) Noticing: No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

Award

Bridges / Tunnels

$158,223.00

Public - City

Outdoor Lighting, Paving, Site Work

6

8

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
105
Bidding Soon
2,386
All Active Projects
1,046
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2022

January 23, 2023

img_map_placeholder

Goldenrod Ave, Newport Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.