BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a transportation facility in Charlotte, North Carolina. Design plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

The Terminal Building D/E Connector Renovation and Addition (DECO) project will renovate and expand the terminal space that connects Concourses D and E, to improve passenger circulation and provide additional floor space for concessions. The project will include a new mezzanine level for a passenger club, airfield apron work to include new loading docks, storage space, and a reconfiguration of the tug road to maintain connectivity between Concourses C and E. On March 13, 2023, City Council approved a contract with C Design Inc. for Design Services. The previous RFQ solicitation is available below for reference: This project entails the renovation of the eastern portion of the passenger terminal building, often referred to as the D/E Connector, as well as a building addition to the south of this connector. The renovation scope of work will encompass approximately 67,000 square feet of shell space to accommodate concessions opportunities and airline offices. The current American Airlines Admirals Club program will require expansion of the building, creating a new 40,000 square foot club shell space. See images below for project boundaries. The project scope includes the following items: Repositioning the major passenger circulation route of the D/E connector between the Atrium to the end of the moving walkways at the approach of Concourse D. Relocating the airline lounge space from the Ticketing level to an upper-level location while expanding it to 40,000 square feet Providing a new passenger destination and experience at the Ticketing level that will provide increased financial returns to the airport Providing service area at the Ramp level to accommodate operational needs per the project program American Airline (AA) Club - 40,000 sf Concessions - 30,000 sf AA Offices - 16,000 sf Loading docks and service courts For questions please contact Nakia McDonald Nakia.McDonald@cltairport.com The method of contractor selection has not been determined at this time.

Design

Transportation Terminals

$700,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
44
Bidding Soon
1,123
All Active Projects
462
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

img_map_placeholder

5501 Josh Birmingham Pkwy, Charlotte, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.