Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Columbus, Mississippi. Contact the soliciting agency for additional information.
SCOPE. This SOO defines the requirement for the Contractor to engineer, furnish, install and test (EFI&T) Single Mode (SM) Fiber Optic Cable (FOC) to support connectivity from HH-0317 to B1114, B1120, and B1130 at Columbus AFB MS. 2.0 REQUIREMENTS. 2.1 GENERAL REQUIREMENTS. 2.1.1 Safety Requirements. The contractor shall remain in compliance with all Federal, State, county, and base security and safety laws, regulations, policies, and requirements. 2.1.2 Site Coordination. The Contractor shall meet with the base safety officer immediately upon arrival on site for review of the specific safety requirements prior to installation. 2.1.2.1 Confined Space. The Contractors and Sub-contractors entering spaces on Columbus AFB MS are responsible for the safety of their personnel and for their own permit space program as outlined in AFMAN 91-203. All confined space operations must be coordinated with the Base Safety Office prior to start of work. The primary Contractor is responsible for all Sub-contractor confined space operations. 2.1.2.2 Accident/Incident Reporting and Investigation. The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel. Notification shall be provided to the 14 CS/SXCP Project Manager and the Base Safety Office unless otherwise stated in the SOO. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the Base POC. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed. 2.1.2.3 Work Area(s). At day's end, the Contractor shall remove all debris and surplus materials from the work place. Safety barriers shall be in place to protect unfinished work site at the end of the day. All open holes or trenches shall be completely enclosed by flexible orange construction safety fencing, or other safety barriers, at the end of the work day. Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that does not cause a safety hazard. The contractor shall co-ordinate with the 14 CS/SXCP to ensure that any locking manhole covers are put back in place at the end of each workday. 2.1.2.4 Traffic Control. In the event base vehicular traffic is to be disrupted by trenching or horizontal directional boring, the Contractor shall notify the 14 CS/SXCP PM NLT 10 calendar days in advance to inform base Security Forces and Emergency Services personnel of the planned disruptions. GENERAL INFORMATION. 3.1 Period of Performance. The period of performance for the project shall be one (1) year post contract award date. 3.2 Place of Performance. The place of performance is Columbus AFB MS. 3.3 Hours of Operation. The Contractor shall routinely work during normal duty hours of the site. However, mission requirements may necessitate work outside normal hours (nights and/or weekends), especially if existing service must be interrupted. Any site work requested by the Contractor to be performed outside of normal duty hours shall be coordinated with the 14 CS/SXCP and approved by the Contracting Officer at least 10 calendar days in advance. 3.4 Holidays/Down Days. The Contractor shall not perform under this contract on federal holidays or site-unique down-days unless expressly authorized by the CO and coordinated with the base POC. 3.5 Base Support. The Contractor shall identify any base support requirements (for example, laydown and storage areas) necessary to complete this project in their proposal. The contractor shall return all government furnished lay-down and storage areas to their original condition upon completion of the project.
Post-Bid
Military
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2022
September 5, 2022
To Be Determined, Columbus, MS
Related To This Project
Columbus, MS
Bid Date: Sep 13 2022
Columbus, MS
Bid Date: Sep 21 2022
Columbus, MS
Bid Date: Feb 01 2023
Columbus, MS
--
Columbus, MS
--
Columbus, MS
Bid Date: Feb 08 2023
Columbus, MS
Bid Date: Feb 03 2023
Columbus, MS
Bid Date: Mar 06 2023
Columbus, MS
Bid Date: Apr 14 2023
Columbus, MS
Bid Date: Jul 27 2022
Columbus, MS
Bid Date: Jul 07 2022
Columbus, MS
Bid Date: Jun 28 2022
Columbus, MS
Bid Date: Apr 27 2023
Columbus, MS
Bid Date: Jun 08 2022
Columbus, MS
Bid Date: Jun 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.