Site work for a civil project in Addison, Illinois. Completed plans call for site work for a water / sewer project.

As of April 9, 2024, a design team has been awarded. The preliminary engineering study for the separation of combined sewers, wastewater treatment plant consolidation, and drainage improvements to the Cherokee Park area. This study will take place in the area between Lake St. to Fullerton Ave. and Addison Rd. to Villa Ave, excluding Normandy Dr. and Princeton St. The study shall provide storm sewer sizing to accommodate a 10-year storm using the most current data. The sewer separation study shall also address any upgrade required at the Diversey Ave. Pump Station. It is also required to provide an analysis for lead water service line replacement in the combined sewer area. The engineer shall be required to conduct an analysis on the wastewater treatment plants to determine the best method for treatment plant consolidation. The study shall include a plan to decommission the AJ LaRocca Facility and convey all flow to the North Waste Water Treatment Plant. It shall be required to determine the most efficient route to convey the wastewater to the North WWTP. It shall be required to develop a plan for plant expansion at the North WWTP as well as capacity and treatment for a combined sewer overflow (CSO). It shall be required to provide an overview on the entire treatment process for the North WWTP to take on the additional flow and comply with phosphorus removal regulations. The study shall state the method for phosphorus removal to comply with a 1.0 mg/L, 0.5 mg/L, and 0.1 mg/L limits. To reduce overland flooding it shall be required to develop a drainage plan for the area north of Cherokee Park. Cherokee Park is owned by the Village of Addison and Addison Park District. It shall be required to determine the amount of land required for retention, the method to hold and release storm water, and provide adequate calculations for retention. Technical questions concerning the RFP may be directed to: Ryan Hayden, Superintendent of Public Works: rhayden@addison-il.org Questions concerning the RFP documents and submittal may be directed to: Anna Hendrey, Purchasing Agent, ahendrey@addison-il.org The method of contractor selection has not been determined at this time.

Award

Water / Sewer

$222,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
88
Bidding Soon
1,803
All Active Projects
783
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

img_map_placeholder

Multiple Locations, Addison, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.