BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Lake Elsinore, California. Completed plans call for site work for a water / sewer project.

As of December 12, 2022, the project has not been awarded. A timeline for award has not been confirmed. REQUIREMENTS: Bid Bond10%, Payment and Performance Bond 100% each, Warranty Bond, Prevailing Wage, Certified Payroll, DIR Public Works Registration and Sample Construction Agreement Scope of Work: Mobilization / Demobilization will include, but not be limited to the movement of personnel, equipment, supplies, and incidentals to the jobsite; setting up construction staging, equipment storage, maintenance yard, site preparation, and the performance of General Conditions. General Conditions means Subcontractor’s costs and expenses reasonably necessary for supervision of the Work, including, but not limited to, all Subcontractor’s head office and branch office staff and other costs incurred at head office or branch offices, all Subcontractor’s on and off-site supervisory, clerical and other Project support and administration personnel, all Subcontractor’s temporary on-site utilities and facilities, including job trailer, temporary toilets, and barricades, security and guard services, payroll taxes and all insurance, worker’s compensation, markups, fees, taxes, levies, and marketing costs, accounting and administration, warranty reserves, trash removal, telephone and telecopier expenses and other communications costs, trucks, travel, lodging, board, disbursements, fuel, and cleanup, printing, and other legally required Subcontractor cost items. Measurement and Payment: Mobilization / Demobilization will be compensated for by the Lump Sum price and shall not exceed 2% of the Contract Sum. 25% of Mobilization price is the maximum allowed on the first billing and is based on full complement of equipment being mobilized. Balance to be billed in accordance to the overall percentage of work completed as confirmed by the Contractor’s field representative and/or project engineer Q&A Deadline July 20, 2022 2:00 PM (PDT)

Bid Results

Water / Sewer

$1,698,677.00

Public - City

Site Work

26

11

2

3

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
112
Bidding Soon
2,428
All Active Projects
1,089
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 26, 2022

img_map_placeholder

Nichols Rd, Lake Elsinore, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.