Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Site work and paving for a sidewalk / parking lot in Stockton, California. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of September 17 2025 the owner, as of March 26, 2025 they are in the design process. A timeline for construction is estimated start is Fall 2026. Closed solicitation has been included below for reference. ............... Downtown Stockton currently has a very limited network of bicycle and pedestrian crossing facilities. The downtown Stockton area has the highest concentration of jobs and businesses in the City. Downtown Stockton has many community destinations that serve both downtown residents and residents from across the City. The project area currently has no striped bike lanes and lacks proper pedestrian facilities, leaving significant gaps in the area for bicycle and pedestrian connectivity. The project streets run through the Downtown Core and link residential communities to parks, schools, Cabral Station (Amtrak, ACE) RTD Bus Station, Stockton Arena, government offices, commercial destinations, and employment centers. This project will provide bicycle, pedestrian, and traffic calming improvements on two important north-south corridors, Lincoln Street and Aurora Street, and one east-west street: Rose Street. Lincoln Street north of the Stockton Marina has two vehicle lanes but is mostly designed with four vehicle lanes south of the Stockton Marina. The Rose and Aurora corridors are smaller streets, each with two vehicle lanes. Lincoln Street has a posted speed limit of 30 MPH and Aurora Street and Rose Street have posted speed limits of 25 MPH. This project was developed in conformance with the Downtown Stockton Active Transportation Plan, Stockton Bicycle Master Plan, and Stockton Safe Routes to Schools Plan. This project directly responds to community needs by improving bike and pedestrian connectivity, safety, access, and mobility to and within downtown Stockton.
Design
Sidewalks / Parking Lot
$1,710,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2026
Multiple Locations, Stockton, CA
Related To This Project
Stockton, CA
Bid Date: Jun 26 2025
Stockton, CA
--
Stockton, CA
Bid Date: Mar 31 2022
Stockton, CA
Bid Date: Aug 18 2022
Stockton, CA
--
Stockton, CA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
