BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work and paving for a sidewalk / parking lot in Stockton, California. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of September 17 2025 the owner, as of March 26, 2025 they are in the design process. A timeline for construction is estimated start is Fall 2026. Closed solicitation has been included below for reference. ............... Downtown Stockton currently has a very limited network of bicycle and pedestrian crossing facilities. The downtown Stockton area has the highest concentration of jobs and businesses in the City. Downtown Stockton has many community destinations that serve both downtown residents and residents from across the City. The project area currently has no striped bike lanes and lacks proper pedestrian facilities, leaving significant gaps in the area for bicycle and pedestrian connectivity. The project streets run through the Downtown Core and link residential communities to parks, schools, Cabral Station (Amtrak, ACE) RTD Bus Station, Stockton Arena, government offices, commercial destinations, and employment centers. This project will provide bicycle, pedestrian, and traffic calming improvements on two important north-south corridors, Lincoln Street and Aurora Street, and one east-west street: Rose Street. Lincoln Street north of the Stockton Marina has two vehicle lanes but is mostly designed with four vehicle lanes south of the Stockton Marina. The Rose and Aurora corridors are smaller streets, each with two vehicle lanes. Lincoln Street has a posted speed limit of 30 MPH and Aurora Street and Rose Street have posted speed limits of 25 MPH. This project was developed in conformance with the Downtown Stockton Active Transportation Plan, Stockton Bicycle Master Plan, and Stockton Safe Routes to Schools Plan. This project directly responds to community needs by improving bike and pedestrian connectivity, safety, access, and mobility to and within downtown Stockton.

Design

Sidewalks / Parking Lot

$1,710,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
520
Active Projects
212
Bidding Soon
3,131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.