Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Lincoln, New Mexico. Completed plans call for site work for a water / sewer project.
Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract Place of Performance: Lincoln County, New Mexico Type of Construction: Other Heavy and Civil Engineering FAR Magnitude: Less than $25,000 NAICS: 237990 SIZE STD: $39.5M SET-ASIDE: Small Business Quote Submittal Information: Due Date: August 15, 2022 at 2:00 pm Local Mountain Time In accordance with this Solicitation Part IV - Representation and Instructions Questions Due Date: July 25, 2022 at 2:00 pm Local Mountain Time Award Selection Process: Lowest Price (f) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government. (g) Quotation must be valid for a minimum of 60 days. (h) Respondents must complete registration utilizing the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/. The Government will obtain respondent representations and certifications through this system. (i) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate. (j) All questions should be emailed directly to the Contracting Officer by the posted due date. Only written RFI's will be considered and responded to by the Government. BLM responses to RFIs will be posted as an amendment to the solicitation. Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer. Introduction: This Statement of Work (SOW) consists of connection to existing 12" iron pipe and installation of 170' of 12" PVC SDR 51 irrigation pipe. Pipe will be buried under 12" of new fill provided by Contractor. Contractor shall install an outfall structure at the downstream end of the new pipe. Care shall be taken to avoid introducing weeds to the area. The project is located between La Cuesta Lane and Rio Bonito in Lincoln County, NM. BLM has an easement for access to the site near 126 Cuesta Ln., Lincoln, NM. The contractor shall provide all labor, supplies, materials and transportation required to perform all tasks included in the statement of work. All work shall be completed within 45 days of the notice to proceed. Site Location and Background Information: Coordinates of this location: 33.503838 N, 105.396732 W There is an existing iron pipe at surface level that discharges to a ditch at the site. This ditch will be replaced with a 12" pipe. Contractor shall connect to existing 12" iron pipe using a bolted repair coupling (Naco PIP 12 inch by 12 inch, Part number: 2928-120I) or equal. Contractor shall install 170' of 12" PVC SDR 51 irrigation pipe that meets minimum requirements of ASTM D2241. All fittings shall meet the same requirements as the associated piping. Pipe shall be laid at a consistent slope for the entire length of the project. Contractor shall provide four 45 degree bends, four 22.5 degree bends and four 11.25 degree bends, which may be needed to keep pipe in ditch alignment and to accommodate change in slope from existing iron pipe to current ditch slope. Any excess fittings shall become the property of the government on completion of the project. A 3' long by 3' wide concrete outfall pad will be installed by Contractor on downstream end of new PVC. The outfall structure shall be 6" thick and roughly match the ditch flowline and shape to provide a transition between the buried pipe cross-section and the existing ditch cross section. All concrete shall be a minimum of 3000 PSI. Fill and Restoration Requirements Contractor must furnish 12" of fill for top of pipe to maintain 1' bury depth. Fill shall be clean dirt, free of weeds, cobbles and boulders. Width of fill will be an average of 4'. After shaping the disturbed surface to allow drainage perpendicular to the original ditch alignment, surface shall be compacted by walk behind plate compactor. Contractor shall complete two passes with plate compactor and shape again if needed for drainage. Fill and other materials brought from off-site shall not contain weeds. Contractor must provide source location for fill for BLM inspection and approval prior to any fill placement on site. Contractor shall ensure that pipe bedding and all fill around pipe is weed-free, free of sharp objects, cobbles and boulders. There may be some vegetation and debris removal necessary to complete the project. All removals necessary to complete the project are incidental and no separate payment will be made. Ground surface shall be restored over all disturbed areas to provide drainage. Special Requirements Regarding Weed Prevention and Restoration Care shall be taken to avoid bringing weeds into the site. Equipment shall be washed and decontaminated prior to transporting equipment onto the construction areas to minimize the introduction of weeds into the area. Equipment shall also be washed and decontaminated prior to transporting equipment from the construction areas to minimize the transportation of weeds out of the area. Submittals: Contractor shall submit the following for approval before beginning work: 1. Concrete Outfall Pad. Precast structure will be allowed subject to submittal and approval process. 2. Fill for pipe burial/cover, to include source material location and description. 3. PVC pipe. 4. Coupler.
Post-Bid
Water / Sewer
$25,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to five free projects and companies, then subscribe for complete access to all contacts and documents. Unlock new opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
August 15, 2022
September 14, 2022
To Be Determined, Lincoln, NM
Related To This Project
Lincoln, NM
Bid Date: Mar 06 2023
Gallup, NM
Bid Date: Jun 21 2022
Hagerman, NM
Bid Date: Jul 26 2022
Albuquerque, NM
--
Cannon AFB, NM
--
Los Alamos, NM
Bid Date: Jan 26 2023
Belen, NM
Bid Date: Oct 19 2023
Bloomfield, NM
Bid Date: Jan 10 2023
Santa Rosa, NM
Bid Date: Jan 11 2023
Las Cruces, NM
--
Santa Fe, NM
Bid Date: Dec 21 2022
Hillsboro, NM
Bid Date: Jan 26 2023
Las Cruces, NM
Bid Date: May 10 2024
Albuquerque, NM
Bid Date: May 31 2023
Roswell, NM
Bid Date: Jan 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--