BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work and paving for a bridge / tunnel in Smithville, Ontario. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reconstruction of the following structures: Beaver Creek Bridge (Structure No. 063215) on Canborough Rd west of Wellandport, Township of West Lincoln; and Netherby Road Bridge (Structure No. 025210) on RR 25/Netherby Rd west of Montrose Rd/RR98 in Niagara Falls. TIMELINE: Detailed designs are at approximately 95% completion. Tender and construction anticipated in 2026, pending final funding and approvals. Further update late spring 2026.

Final Planning

Bridges / Tunnels

$7,000,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

Project location map

Multiple Locations, Smithville, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.