Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 5, 2024 at 7:00 PM
Updated January 27, 2024
Demolition, site work, paving and new construction of a civil project in Churchill, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.
As of January 5, 224, the project has not been awarded. A timeline for award has not been confirmed. This is a Partial Design Build Roadway Project. Design Activities Are Limited to: Traffic Control Plan (Phase 2&3). The Sr 376-a72 Parkway East Betterment Project Includes 2 Inches of Mill and Paving Along with Replacing the Entire Median Concrete Barrier. The Structure Work Includes Preservation and Superstructure Replacement on 8 Mainline Structures, 2 Overhead Structures, 1 Ramp Structure, a 4 Span Superstructure Replacement, and Other Miscellaneous Construction, All Within a Length of 23,827.66 Linear Feet (4.513 Miles) as Indicated on the Approved Drawings Included in the Bid Package for State Route 376 Section A72 in Allegheny County, Wilkins and Penn Hills Townships, Churchill and Monroeville Boroughs, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point Approximately 480 Feet East of the Sr 2048 (Us Route 22 Business) Interchange at Segment 0800/0801 Offset 0344 (Station 122+79) to the Sr 0022 (William Penn Highway) Interchange at Segment 0844/0845 Offset 0454/0692 (Station 363+09/363+87). Project Cost Range: $60,000,000.00 - $69,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 46.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - RFP D/B - I-376, Churchill to Monroeville *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$70,171,328.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
January 22, 2024
I-376, Churchill, PA
Related To This Project
Churchill, PA
Bid Date: May 28 2025
Hadley, PA
--
Polk Township, PA
--
Franklin Township, PA
Bid Date: Dec 12 2024
Bloomsburg, PA
Bid Date: Jan 11 2024
Mountain Top, PA
--
Altoona, PA
--
Jackson Township, PA
--
Kennedy Township, PA
Bid Date: Dec 14 2023
Kingston, PA
Bid Date: Nov 18 2021
Center Township, PA
--
Williamsport, PA
--
Newtown, PA
--
Newport, PA
--
Honesdale, PA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
