Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 3, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of an educational facility in Egg Harbor City, New Jersey. Working plans call for the renovation of a educational facility.
Project Narrative (Scope of Work) Use Group: B (Existing - No Chage) Construciton Classification: 2b (Existing - No Change) Number of Stories: 3 (Existing - No Change) Height of Structure: +- 55 (Existing - No Change) Area of Renovated Areas: +- 3,678 Square Feet Removal and reinstallation of existing ceiling grids within area of work as indicated on drawings. Patch existing gyp. board ceiling as required. removal of existing ceiling and installation of new ceiling in the gallery space on level 000 (41) as indicated on plan. Power circuit modifications to support the mechanical work described above. Upgrade (retrofit) of (12) electrical distribution panels and replacement of (3) interior transformers. Replacement of the existing 150 kW, natural gas-fired, interior standby generator, and installation of one new standby power circuit for the IT closet in E-Wing. Extension of existing sprinkler head to new dropped ceiling in the gallery space on level 000 (41) Removal and replacement of 16 packaged gas/electric rooftop units and the associated curb adapters (14 on E-Wing Roof and 2 on F-Wing Roof). Removal and replacement of (2) air-conditioning split systems. Removal of 100 VAV boxes and installation of new ones with hot water reheat coils. Replacement of (12) duct-mounted hydronic heating coils and the associated control valves. Replacement of (8) existing hydronic circulating pumps. Installation of (2) new hydronic circulating pumps and installation of new hydronic distribution piping to serve the new VAV boxes. Ductwork modifications on the roof level and lower level of the F-Wing building. Removal of 11 laboratory fume hood exhaust fans at the roof level. HVAC control upgrades. Removal of one (1) existing, natural gas-fired, 100-gallon domestic hot water heater and installation of (2) new power-vented models. Questions Due -> July 26, 2022 Vendors shall follow the instructions contained in this IFB in preparing and submitting a response. Failure to abide by the instructions may cause the submission to be deemed non-responsive and may be cause for rejection. A. Work to be performed under this project includes, but is not necessarily limited to the following: For additional information, please view the associated project documents. 1. Building: Removal and reinstallation of existing ceiling grids within area of work as indicated on drawings. Patch existing gyp. board ceiling as required. removal of existing ceiling and installation of new ceiling in the gallery space on level 000 (41) as indicated on plan. 2. Electrical: Power circuit modifications to support the mechanical work described above. Upgrade (retrofit) of (12) electrical distribution panels and replacement of (3) interior transformers. Replacement of the existing 150 kW, natural gas-fired, interior standby generator, and installation of one new standby power circuit for the IT closet in E-Wing. 3. Fire Suppression (Sprinklers): Extension of existing sprinkler head to new dropped ceiling in the gallery space on level 000 (41). 4. Mechanical: Removal and replacement of 16 packaged gas/electric rooftop units and the associated curb adapters(14 on E-Wing Roof and 2 on F-Wing Roof). Removal and replacement of (2) air-conditioning split systems. Removal of 100 VAV boxes and installation of new ones with hot water reheat coils. Replacement of (12) duct-mounted hydronic heating coils and the associated control valves. Replacement of (8) existing hydronic circulating pumps. Installation of (2) new hydronic circulating pumps and installation of new hydronic distribution piping to serve the new VAV boxes. Ductwork modifications on the roof level and lower level of the FWing building. Removal of 11 laboratory fume hood exhaust fans at the roof level. HVAC control upgrades. 5. Plumbing: Removal of one (1) existing, natural gas-fired, 100-gallon domestic hot water heater and installation of (2) new power-vented models. Project has been cancelled.
Final Planning
Educational
$200,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed