BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Egg Harbor City, New Jersey. Working plans call for the renovation of a educational facility.

Project Narrative (Scope of Work) Use Group: B (Existing - No Chage) Construciton Classification: 2b (Existing - No Change) Number of Stories: 3 (Existing - No Change) Height of Structure: +- 55 (Existing - No Change) Area of Renovated Areas: +- 3,678 Square Feet Removal and reinstallation of existing ceiling grids within area of work as indicated on drawings. Patch existing gyp. board ceiling as required. removal of existing ceiling and installation of new ceiling in the gallery space on level 000 (41) as indicated on plan. Power circuit modifications to support the mechanical work described above. Upgrade (retrofit) of (12) electrical distribution panels and replacement of (3) interior transformers. Replacement of the existing 150 kW, natural gas-fired, interior standby generator, and installation of one new standby power circuit for the IT closet in E-Wing. Extension of existing sprinkler head to new dropped ceiling in the gallery space on level 000 (41) Removal and replacement of 16 packaged gas/electric rooftop units and the associated curb adapters (14 on E-Wing Roof and 2 on F-Wing Roof). Removal and replacement of (2) air-conditioning split systems. Removal of 100 VAV boxes and installation of new ones with hot water reheat coils. Replacement of (12) duct-mounted hydronic heating coils and the associated control valves. Replacement of (8) existing hydronic circulating pumps. Installation of (2) new hydronic circulating pumps and installation of new hydronic distribution piping to serve the new VAV boxes. Ductwork modifications on the roof level and lower level of the F-Wing building. Removal of 11 laboratory fume hood exhaust fans at the roof level. HVAC control upgrades. Removal of one (1) existing, natural gas-fired, 100-gallon domestic hot water heater and installation of (2) new power-vented models. Questions Due -> July 26, 2022 Vendors shall follow the instructions contained in this IFB in preparing and submitting a response. Failure to abide by the instructions may cause the submission to be deemed non-responsive and may be cause for rejection. A. Work to be performed under this project includes, but is not necessarily limited to the following: For additional information, please view the associated project documents. 1. Building: Removal and reinstallation of existing ceiling grids within area of work as indicated on drawings. Patch existing gyp. board ceiling as required. removal of existing ceiling and installation of new ceiling in the gallery space on level 000 (41) as indicated on plan. 2. Electrical: Power circuit modifications to support the mechanical work described above. Upgrade (retrofit) of (12) electrical distribution panels and replacement of (3) interior transformers. Replacement of the existing 150 kW, natural gas-fired, interior standby generator, and installation of one new standby power circuit for the IT closet in E-Wing. 3. Fire Suppression (Sprinklers): Extension of existing sprinkler head to new dropped ceiling in the gallery space on level 000 (41). 4. Mechanical: Removal and replacement of 16 packaged gas/electric rooftop units and the associated curb adapters(14 on E-Wing Roof and 2 on F-Wing Roof). Removal and replacement of (2) air-conditioning split systems. Removal of 100 VAV boxes and installation of new ones with hot water reheat coils. Replacement of (12) duct-mounted hydronic heating coils and the associated control valves. Replacement of (8) existing hydronic circulating pumps. Installation of (2) new hydronic circulating pumps and installation of new hydronic distribution piping to serve the new VAV boxes. Ductwork modifications on the roof level and lower level of the FWing building. Removal of 11 laboratory fume hood exhaust fans at the roof level. HVAC control upgrades. 5. Plumbing: Removal of one (1) existing, natural gas-fired, 100-gallon domestic hot water heater and installation of (2) new power-vented models. Project has been cancelled.

Final Planning

Educational

$200,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
72
Bidding Soon
1,713
All Active Projects
740
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

September 1, 2022

img_map_placeholder

101 Vera King Farris Dr, Egg Harbor City, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.