Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The work in this contract is for the Champions West Water Line Replacement for Champions Municipal Utility District (Champions MUD) located in Harris County, Texas. The purpose of this project is to replace aging water lines in the Champions West neighborhood and along Champion Forest Drive, including gate valves and fire hydrants, to prevent future water main breaks in the area. In general, this work consists of: Installation of 4-inch, 6-inch, 8-inch, and 12-inch AWWA C-900 water line, by trenchless construction, for all depths, including tracer wire, restrained joints, bends, fittings, open right gate valves with boxes, and Mueller, or approved equal, fire hydrant assemblies. Disinfection and hydrostatic testing shall be completed by the Contractor. Installation of 14-inch steel casing, by trenchless construction, including fittings. Connection of the new water lines to the existing water system by tapping sleeve and valves and wet connections. Installation and connection of new 1-inch long-side and 1-inch short-side service leads from new water line to existing residential water meters using tapping saddle with stainless steel band, including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal, with u-branches or standard compression fittings at the meter connection. Service lines for 3/4 -inch water meters shall be a single 1-inch service line with a 1-inch by 3/4 -inch u-branch for two meters or standard compression fitting for one meter. Service lines for water meters 1-inch and larger shall be a single line that matches meter size for each meter. No 90-degree curb stops will be allowed. Installation and connection of new service leads, to match existing service lead diameter, from the new water line to the existing commercial water meters using stainless steel tapping saddle or sleeve including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal. No 90-degree curb stops will be allowed. Abandonment of existing 2-inch, 4-inch, 6-inch, 8-inch, and 12-inch water lines including cutting, draining, plugging, and grouting the existing water line as shown in the plans. Removing existing fire hydrant assemblies and plugging the old fire hydrant connection on the existing line. Existing fire hydrants that are removed are to be salvaged and returned to Champions MUD. Remove and replace concrete pavement including subgrade, curb and gutter, and pavement markings. Site restoration of disturbed areas including replacing damaged sidewalks, ramps, driveways, pavement, turf, plants, shrubs, trees, irrigation lines, fences, and gates. Implementation, maintenance, and removal of traffic control plan, trench safety, and storm water pollution prevention plan best practices including inlet protection barriers. It is the responsibility of the contractor bidding the project to ensure the accuracy of the reproduction of all bid documents and construction drawings. The responsibility includes, but is not limited to proper scaling, paper width and length, etc. Failure to do so may result in errors in the unit bid quantities and/or bid amounts. There will be a site visit after the meeting. The work in this contract is for the Champions West Water Line Replacement for Champions Municipal Utility District (Champions MUD) located in Harris County, Texas. The purpose of this project is to replace aging water lines in the Champions West neighborhood and along Champion Forest Drive, including gate valves and fire hydrants, to prevent future water main breaks in the area. B. In general, this work consists of: 1. Installation of 4-inch, 6-inch, 8-inch, and 12-inch AWWA C-900 water line, by trenchless construction, for all depths, including tracer wire, restrained joints, bends, fittings, open right gate valves with boxes, and Mueller, or approved equal, fire hydrant assemblies. Disinfection and hydrostatic testing shall be completed by the Contractor. 2. Installation of minimum 14-inch steel casing, by trenchless construction, including fittings. Contractor shall make sure proposed water line with restrained joints and spacers has the needed clearance for installation inside the proposed steel casing. 3. Connection of the new water lines to the existing water system by tapping sleeve and valves and wet connections. 4. Installation and connection of new 1-inch long-side and 1-inch short-side service leads from new water line to existing residential water meters using tapping saddle with stainless steel band, including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal, with u-branches or standard compression fittings at the meter connection. Service lines for 3/4 -inch water meters shall be a single 1-inch service line with a 1-inch by 3/4 -inch u-branch for two meters or standard compression fitting for one meter. Service lines for water meters 1-inch and larger shall be a single line that matches meter size for each meter. No 90-degree curb stops will be allowed. 5. Installation and connection of new service leads, to match existing service lead diameter, from the new water line to the existing commercial water meters using stainless steel tapping saddle or sleeve including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal. No 90-degree curb stops will be allowed. 6. Abandonment of existing 2-inch, 4-inch, 6-inch, 8-inch, and 12-inch water lines including cutting, draining, plugging, and grouting the existing water line as shown in the plans. 7. Removing existing fire hydrant assemblies and plugging the old fire hydrant connection on the existing line. Existing fire hydrants that are removed are to be salvaged and returned to Champions MUD. 8. Remove and replace concrete pavement including subgrade, curb and gutter, and pavement markings. 9. Site restoration of disturbed areas including replacing damaged sidewalks, ramps, driveways, pavement, turf, plants, shrubs, trees, irrigation lines, fences, and gates. 10. Implementation, maintenance, and removal of traffic control plan, trench safety, and storm water pollution prevention plan best practices including inlet protection barriers.
Bid Results
Water / Sewer
$2,367,637.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2022
October 30, 2022
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
Bid Date: Aug 18 2022
Houston, TX
Bid Date: Aug 10 2022
Houston, TX
--
Houston, TX
Bid Date: Aug 01 2022
Houston, TX
Bid Date: Jul 20 2022
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.