BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a municipal facility in Big Spring, Texas. Completed plans call for site work for a municipal facility.

The purpose of this investigation was to conduct subsurface exploration and to determine the subsurface conditions at the project site to develop geotechnical recommendations for the new metal and CMU buildings including foundation alternatives, required depths, and allowable bearing capacity values of the subgrade soils beneath the structures. In addition, the field and laboratory testing will include tests for roadway design recommendations for the new commercial paving systems based on projected traffic volumes and types of loads as well as engineering best practices for pavement systems. The scope of services provided for this project included an initial site reconnaissance performed by Terra personnel, soil exploration by drilling three (3) deep test holes for the building areas and three (3) deep test holes borings along the proposed pavement areas. Work included field drilling and laboratory testing, and an evaluation of the subsurface conditions. A report of Terra's findings and geotechnical engineering evaluation and recommendations was prepared. The scope of our Geotechnical Engineering Study does not include an environmental assessment of the air, soil, rock, or water conditions either on or adjacent to the site. No environmental opinions are presented in this report. Contact information and submittal procedures for such questions are as follows: Submit via email to Pamela Gonzales, PGonzales@Parkhill.com A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidders maximum Bid price (determined by adding the base bid and all alternates) and in the form of certified check, bank money order or a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the Contract for Construction. Such Bid bond will be issued in the form included in the Bidding Documents. Default of Bidder occurs upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

Post-Bid

Municipal

$800,000.00

Public - City

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
306
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2022

September 2, 2022

img_map_placeholder

To Be Determined, Big Spring, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.