BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2024 at 8:00 PM

Updated March 28, 2025

Site work and paving for a bridge / tunnel in Saint Paul, Minnesota. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

As of April 5, 2024, per owner a design team has been identified. Bidding/construction timeline have not been identified. MnDOT requests responses for replacement design for existing Bridges 9631 and 9632 (John Ireland Blvd. over I-94 in downtown St. Paul), as well as bridge repair and/or painting plans for a number of additional bridges along the I-94 corridor through St. Paul. The method of contractor selection has not been determined at this time. MNDOT - RFP Engineering - John Ireland Blvd Bridge Superstructure Replacement and I-94 Corridor Bridge Painting and Preservation

Design

Bridges / Tunnels

$600,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
126
Bidding Soon
1,567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

Project location map

John Ireland Blvd, Saint Paul, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.