Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 14, 2022 at 8:00 PM
Updated June 15, 2024
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.
Metcalfe Chiller ITB Preapproved VT Vendors Only Scope of Work North chiller Disassemble/ remove (4) bad micro channel condenser coils or industry standard Install (4) new condenser coils approx. 44x78 inches Disassemble/remove old marquee display Install new scrolling marquee display Add refrigerant – 410A Leak and vacuum test system Startup to ensure proper operation Invitation to Bid South chiller Disassemble/remove (1) bad compressor Furnish and Install (1) New Compressor - 25 h/p or match existing Disassemble/remove bad contactor and filter drier Furnish and install contactor and liquid line filter drier Add refrigerant – 410A Leak and vacuum test system Startup to ensure proper operation A. Refrigerant Coils: 1. Coils rated and tested in accordance with AHRI 410. 2. Tubes: Material to consist of seamless copper, mechanically expanded to fins; appropriate tube joining methods based on tube material. 3. Fins: Material to consist of aluminum or copper, continuous plate type with full fin collars. Maximum of 12 fins per inch (FPI). 4. Casing: ASTM A666, Type 304 stainless steel, minimum 0.0625 inch thick for slip-in or flanged mounting. 5. Maximum face velocity shall not exceed 450FPM. 6. Suction Header: Construct of nonferrous material with tube connection appropriate to header material provided. ASTM B88, Type L copper tube with brazed joints. 7. Liquid distributor: Brass or copper venture type with seamless copper distribution tubes; maximum 12 or 18 circuits per distributor. ASTM B88, Type L copper tube with brazed joints. 8. Configuration: Down feed with bottom suction to prevent oil trapping. 9. Acceptable Factory Testing Methods: a. Proof test at 1.5 times the maximum operating pressure and leak test at the maximum operating temperature. b. Perform hydrostatic testing for coils with removable headers in accordance with approved shop drawings and normally accepted means and methods Please use the following link to view Bid Opening: Meeting ID meet.google.com/qos-axae-ok
Post-Bid
Educational
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2022
October 13, 2022
12339 S Normal Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Sep 13 2022
Chicago, IL
Bid Date: Sep 13 2022
Chicago, IL
Bid Date: Sep 12 2022
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Sep 12 2022
Chicago, IL
Bid Date: Sep 14 2022
Chicago, IL
Bid Date: Sep 14 2022
Chicago, IL
Bid Date: Sep 14 2022
Chicago, IL
Bid Date: Sep 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
