BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Chicago, Illinois. Completed plans call for the renovation of a water / sewer project.

The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. Replacement of Condensate and Sump Pump Provide supervision equipment materials and skilled labor to perform the following Condensate Return pump replacement: Contractor to remove and replace existing condensate return pump assembly, including collection basin, pumps, piping and valving, controls and power. Provide new local disconnect switch for new assembly located high on wall within space. All electrical enclosures to be NEMA 4 rating. See attached standard detail and specification for additional details. New assembly to match existing in flow rate, head pressure and electrical characteristics. Sump Pump replacement: Contractor to remove existing sump pump and replace with new sump basin and assembly. Provide new local disconnect mounted high on wall within space. All electrical enclosures to be NEMA 4 rating. See attached standard detail and specification for additional details. New assembly to match existing in flow rate, head pressure and electrical characteristics. New basin to be provided within existing floor opening, with connection to existing underground pipes. Rod out all entries to the new sump assembly. If building or CPS properties are damage during construction, contractor to replace and or repair as necessary. All questions/request must be received two business prior to bid closing. All work shall be coordinated with the board authorize representative to complete in a greed upon time frame. Contractor crew is to remove and dispose of materials torn out and any construction debris. All trash must be roved off-sight by vendor and area left clean. All work to be completed according to CPS Specifications.

Bid Results

Water / Sewer

$69,800.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
92
Bidding Soon
1,774
All Active Projects
778
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

September 1, 2022

img_map_placeholder

9652 S Michigan Ave, Chicago, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.