BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2022 at 8:00 PM

Updated September 14, 2023

Addition to a military facility in Patuxent River, Maryland. Completed plans call for the addition of a 5,440-square-foot military facility.

Location of the Work: Building 2370, NAS Patuxent River, Maryland Description of the Work: The work includes a building addition of approximately 5,440 square feet to B2370; the addition is a rectangular slope roof building similar to the existing building and will connect to the existing north façade of Building 2370; the addition will be a secure space and will include open and walled offices and a conference room; the addition will have vertical galvalume metal rainscreen wall panels with low slope light gray metal roof similar to Building 2370; the addition roof will be a low slope metal standing seam roof with a slope approximately 1-1/2:12 similar but slightly steeper than adjacent structures; the superstructure of the addition consists of a metal deck, structural steel, and steel open-web joists; foundation system consists of concrete shallow spread footings; HVAC and plumbing, electrical and telecommunications are to be provided; site improvements include the addition of parking spaces, grading and drainage improvements and utility connections and incidental related work. The project includes a Base Bid: CLIN 0001: Price for the entire work for the addition to Building 2370, complete to the 5 foot line outside of the building, in accordance with the drawings and specifications; CLIN 0002: Price for the entire Site work complete to the 5 foot line outside of the building, in accordance with the drawings and specifications. CLIN 0003: Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specifications. Estimated Budget Amount or Price Range: between $1,000,000 and $5,000,000. Time for Completion: Government desires completion of construction within 425 calendar days of award. Liquidated Damages: $8,423.68 for each calendar day of delay. Wage Determination: Department of Labor (DoL) General Decision Number DBA WD #MD2022008 Modification #4 dated 07/01/2022 applies to this work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$5,000,000.00

Public - Federal

Addition

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
416
Active Projects
180
Bidding Soon
3,013
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2022

September 26, 2022

Project location map

Building 2370, Patuxent River, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.