BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of an educational facility in Fairfield, Connecticut. Working plans call for the renovation of a educational facility.

The Town of Fairfield (Town) on behalf of Fairfield Public Schools (FPS) is seeking competitive proposals from qualified Contractors to provide materials, labor, equipment and all else necessary to remove the existing scoreboards located at Fairfield Ludlowe High School and Fairfield Warde High School and to design, build, supply and install new digital scoreboards at these same locations as per the specifications outlined in this RFP document. Fairfield Ludlowe High School, 785 Unquowa Road, Fairfield, CT - (Approved budget - $140K) Work for this project shall be preferred to be completed by the start of the 2022 school year, which begins on August 29th, 2022, or shortly thereafter. If you are proposing an alternate schedule, please submit this information with your proposal keeping in mind that FPS desires this project to be completed as close to the beginning of the school year as possible. Fairfield Warde High School, 755 Melville Avenue, Fairfield, CT - (Pending availability of funding) - Summer 2023 Written requests for information will not be accepted after 11:00am on Thursday, 28th July, 2022. Questions concerning this bid must be submitted in writing and directed only to: Lee A. Flaherty, Junior Buyer, LFlaherty@fairfieldct.org Response will be in the form of an addendum that will be posted approximately Friday, 29th July, 2022 to the Town of Fairfield electronically. A five (5) percent bid bond or equal approved security as stated per the Terms and Conditions must be submitted with the proposal. This is a prevailing wage rates project and is subject to all CTDOL requirements. Certified Payroll will be required for all work completed. State law requires a minimum of twenty-five percent (25%) of the state-funded portion of the contract for award to Subcontractors holding current certification from the Connecticut Department of Administrative Services (DAS) under the provisions of CONN. GEN. STAT. 4a-60g, as amended. (Twenty-five percent (25%) of the work with DAS certified Small and Minority owned businesses and twenty-five percent (25%) of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The Contractor must demonstrate good faith effort to meet the twenty-five percent (25%) set-aside goals.

Final Planning

Educational

$140,000.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
831
Active Projects
383
Bidding Soon
5,999
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

October 31, 2022

Project location map

Multiple Locations, Fairfield, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.