BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Denver, Colorado. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

**As of October 11 ,2022, project was awarded to CONCRETE WORKS OF COLORADO, INC, awarded amount is $4,880,900.95.** The 29th & Speer Sanitary project will remove and replace existing storm sewer in Speer Blvd from W 29th Ave to Bryant St. Restoration shall include landscaping, concrete flatwork and asphalt paving. Non-ADA compliant accessible curb ramps will also be replaced with compliant ramps. The Louisiana Ave & S Pearl St Intersection Improvements will regrade the existing ROW section to regain the street's stormwater capacity and direct runoff to current standard and sized storm inlets. Existing inlets and portions of the existing stormdrain in system in Louisiana Ave will be removed. Sidewalks and ADA accessible curb ramps will also be reconstructed to current standards. Deadline to Submit Questions: August 10, 2022 at 3:00 p.m., local time. Please submit questions to DOTI.Procurement@denvergov.org. Additonal Description: 12% MWBE PREQUALIFICATION REQUIREMENTS: Each bidder must be prequalified in category 1E(4) Piped Sewer at or above the $6,000,000 monetary level. Between $3,800,000.00 and $4,200,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PRO TRACKING NO : PWWW2020-006 PROJECT MASTER NO : 2019-PROJMSTR-0000409 ACCELA REVIEW NO : 2022-CIP-0000032 The Work consists of providing various public involvement activities for the Project. Additional requirements may be included elsewhere within the Contract Documents. Public information services shall include, at minimum, the following: a) Responding to questions concerning Project activities and schedules b) Participating in, and documenting meetings held with affected individuals, residents and/or business c) Maintaining ongoing communication with residents and businesses directly impacted by construction activities and traffic control plans for the project d) Maintaining a written log which documents calls and concerns. The log shall include: the nature of the concern, response(s) provided, date of completion for any required remedial action and any necessary future follow up with a frequency.

Award

Water / Sewer

$4,880,901.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
996
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.